Laserfiche WebLink
ARDEN HILLS CITY COUNCIL – JUNE 27, 2016 15 <br /> <br />City Planner Streff noted the Planned Unit Development process is a tool that provides <br />additional flexibility for development that an underlying zoning district would not otherwise <br />allow. For example, a PUD may make exceptions to setbacks, lot coverage, parking requirements, <br />signage, building materials, or landscaping requirements. It is intended to overcome the <br />limitations of zoning regulations and improve the overall design of a project. While the PUD <br />process allows the City to negotiate certain aspects of the development, any conditions imposed <br />on the PUD must have a rational basis related to the expected impact of the development. A PUD <br />cannot be used to permit uses that would not otherwise be permitted in the underlying zoning <br />district. <br /> <br />City Planner Streff explained the first step in the PUD process is the Master PUD, which is a <br />detailed concept plan for the entire development proposal, often outlining individual phases for <br />development over a specified period of time. The second step is the Final PUD for each phase, <br />which is a more detailed review as each development phase moves forward. During the Master <br />PUD stage, the City works with the applicant to set an overall design framework or standard for a <br />proposed development. These standards are then written into a development agreement which <br />generally includes the design standards, a list of conditions, the size of the development, and what, <br />if any, deviations from the underlying zoning district will be permitted. Once the Master PUD is <br />approved, the applicant then creates a development that conforms to the development agreement <br />for each subsequent Final PUD phase. The level of detail is guided by the type and scale of the <br />development as well as the guidance or flexibility within the Zoning Code. <br /> <br />City Planner Streff reviewed the Plan Evaluation, the Sign Code Review and Subdivision Code. <br /> <br />City Planner Streff stated the Planning Commission reviewed Planning Case 16-014 at their <br />regular meeting on June 8, 2016. Draft minutes from the meeting are included in Attachment G. <br />The Planning Commission offers the following eleven (11) findings of fact for consideration: <br /> <br />General Findings: <br />1. The applicant is requesting approval of a Master Planned Unit Development (PUD) <br />Agreement & Final PUD for Phase 1 of the Land O’Lakes Corporate Headquarters <br />consolidation plan located at 4001 Lexington Avenue North. <br />2. Phase 1 of the Land O’Lakes Corporate Headquarters consolidation plan includes the <br />expansion of the south parking lot on the campus and Phase 2 includes the construction of <br />a new four-story office building along with the reconfiguration and expansion of the <br />parking area on the north side of the campus. <br />3. The PUD process allows for flexibility within the City’s regulations through a negotiated <br />process with a developer. <br />4. The Land O’Lakes property is comprised of 47.37 acres. <br />5. The Land O’Lakes property is located at 4001 Lexington Avenue North. <br />6. The Land O’Lakes property is located in the I-1 – Limited Industrial District. <br />7. The proposed use is a permitted use in the I-1 – Limited Industrial District. <br />8. The Master Planned Unit Development (PUD) Amendment and Final PUD for Phase 1 are <br />in substantial conformance with the requirements set forth in the City’s Zoning Code and <br />design standards. <br />9. Where the plan is not in conformance with the City’s Zoning Code, flexibility has been <br />requested by the applicant.