Laserfiche WebLink
ARDEN HILLS PLANNING COMMISSION – July 6, 2016 3 <br /> <br />City Planner Streff explained that the first step in the PUD process is the Master PUD, which is <br />a detailed concept plan for the entire development proposal, often outlining individual phases for <br />development over a specified period of time. The second step is the Final PUD for each phase, <br />which is a more detailed review as each development phase moves forward. During the Master <br />PUD stage, the City works with the applicant to set an overall design framework or standard for a <br />proposed development. These standards are then written into a development agreement which <br />generally includes the design standards, a list of conditions, the size of the development, and <br />what, if any, deviations from the underlying zoning district will be permitted. Once the Master <br />PUD is approved, the applicant then creates a development that conforms to the development <br />agreement for each subsequent Final PUD phase. The level of detail is guided by the type and <br />scale of the development as well as the guidance or flexibility within the Zoning Code. <br /> <br />Site Data <br />Land Use Plan: I/O – Light Industrial and Office <br />Existing Land Use: OFC – Office <br />Zoning: I-1 – Limited Industrial District <br />Current Lot Sizes: 47.37 Acres (2,063,577.7 square feet) <br />Topography: Fairly Flat <br /> <br />City Planner Streff reviewed the surrounding area, the Plan Evaluation along with the Sign <br />Code Review. <br /> <br />City Planner Streff provided the Findings of Fact for review: <br /> <br />General Findings: <br />1. The applicant is requesting approval of a Final Planned Unit Development (PUD) for <br />Phase 2 of the Land O’Lakes Corporate Headquarters consolidation plan located at 4001 <br />Lexington Avenue North. <br />2. The approved Master PUD Amendment for the Land O’Lakes Corporate Headquarters <br />consolidation and expansion project includes two (2) phases of development. <br />3. As approved by the City Council, Phase 1 of the Master PUD includes the expansion of <br />the south parking lot on the campus. <br />4. The proposed Phase 2 includes the construction of a new four-story office building along <br />with the reconfiguration and expansion of the parking area on the north side of the <br />campus. <br />5. The PUD process allows for flexibility within the City’s regulations through a negotiated <br />process with a developer. <br />6. The Land O’Lakes property is comprised of 47.37 acres. <br />7. The Land O’Lakes property is located in the I-1 – Limited Industrial District. <br />8. The proposed use is a permitted use in the I-1 – Limited Industrial District. <br />9. Phase 2 of the approved Master PUD Amendment is substantial conformance with the <br />requirements set forth in the City’s Zoning Code and design standards. <br />10. Where the plan is not in conformance with the City’s Zoning Code, flexibility has been <br />requested by the applicant. <br />11. A traffic study has been completed for the expansion of the Campus. <br />12. The proposed plan is in conformance with the City’s 2030 Comprehensive Plan. The <br />property at 4001 Lexington Avenue North is guided for Light Industrial and Office (I/O).