Laserfiche WebLink
ARDEN HILLS CITY COUNCIL – JUNE 27, 2016 20 <br /> <br />D. Planning Case 16-013 – CUP Amendment and Variance – Mounds View High <br />School <br /> <br />City Planner Streff stated Mounds View High School currently operates under a Conditional Use <br />Permit (CUP) that was approved in 1978. Any modification to the original CUP requires that a <br />CUP amendment be processed. The original CUP has been amended from time-to-time as the <br />school and campus have expanded over the past years. In this case, the Mounds View School <br />District is requesting an amendment to the existing CUP in order to replace the existing <br />scoreboard and press box at the football stadium and to construct a new storage building adjacent <br />to the baseball field. A variance is also required in this planning case in order for the scoreboard <br />and press box to exceed fifteen (15) feet in height. <br /> <br />City Planner Streff explained Mounds View High School is located in the R-1 Single Family <br />Residential Zoning District, which permits schools as a conditional use, however, any additions to <br />the campus, or amendments to the original CUP must still meet the requirements of the underlying <br />zoning district. <br /> <br />City Planner Streff reported the Mounds View School District is proposing a Conditional Use <br />Permit (CUP) Amendment and Variance in order make the following improvements to the athletic <br />field complex at their property located at 1900 Lake Valentine Road. <br /> <br />1) Scoreboard – Replace the existing scoreboard that was installed in the 1980s with a new <br />scoreboard from Daktronics. The existing scoreboard is approximately 11-feet in height by <br />25-feet in width, or 275 square feet in size. The proposed scoreboard to be installed is 12- <br />feet 11-inches in height by 23-feet 11-inches in width, or approximately 309 square feet in <br />size. Both the existing scoreboard and the proposed scoreboard are elevated on posts that <br />are 10-feet above grade. The new scoreboard would be positioned in the same location as <br />the existing scoreboard. <br /> <br />Accessory structures are permitted to be up to fifteen (15) feet in height in the R-1 Zoning <br />District. In this case, the scoreboard is considered an accessory structure and the new <br />scoreboard is being proposed at a total height above grade at 22-feet 11-inches. In order for <br />the new scoreboard to be constructed a Variance along with the CUP Amendment is <br />required. <br /> <br />2) Press Box – Replace the existing press box located on the “home side” of the football <br />stadium and positioned above the bleachers. The new press box would be 9-feet by 54- <br />feet, or 486 square feet in size. The existing press pox is approximately 9-feet by 30-feet, <br />or 270 square feet in size. <br /> <br />Accessory structures are permitted to be up to fifteen (15) feet in height in the R-1 Zoning <br />District. The press box is considered an accessory structure and is being proposed at a total <br />height of 19-feet 4-inches above grade from the back of the bleachers or 33-feet 4-inches <br />above the grade of the playing field. <br />