Laserfiche WebLink
ARDEN HILLS CITY COUNCIL – JUNE 27, 2016 21 <br /> <br />3) Accessory Storage Building – Construct a new 20-foot by 20-foot (400 sq. ft.) accessory <br />storage building adjacent to the west side of the baseball field near batting cages on the <br />west side of the field. <br /> <br />Accessory structures are permitted to be up to fifteen (15) feet in height in the R-1 Zoning <br />District. The new accessory structure would be 10-feet in height and comparable in design <br />and the materials used on other structures within the athletic field complex. The exterior <br />finish of the structure would largely consist of rock faced block to match the block that was <br />used to construct the dugouts. The structure would have one (1) service door entrance <br />installed along with two (2) 10-foot wide by 8-foot tall overhead doors. <br /> <br />City Planner Streff reviewed the Plan Evaluation, the Conditional Use Permit Criteria and the <br />Variance Evaluation Criteria. <br /> <br />City Planner Streff indicated the Planning Commission reviewed Planning Case 16-013 at their <br />regular meeting on June 8, 2016. Draft minutes from the meeting are included in Attachment J. <br />The Planning Commission offers the following nineteen (19) findings of fact for consideration: <br /> <br />General Findings: <br />1. The property at 1900 Lake Valentine Road is located in the R-1 Single Family Residential <br />Zoning District. <br />2. The applicant is requesting a Conditional Use Permit (CUP) Amendment and Variance in <br />order to install a new scoreboard, press box, and storage building on the athletic field <br />complex. <br />3. The Variance in this case, is being requested to allow the scoreboard and press box to <br />exceed fifteen (15) feet in height. <br />4. Mounds View High School operates under a Conditional Use Permit in the R-1 Zoning <br />District. <br />5. Athletic fields and accessory equipment are permitted under the original CUP for Mounds <br />View High School. <br />6. The proposed application will not exceed the lot coverage limits for the property. <br />7. The proposed application meets all setback requirements. <br /> <br /> Conditional Use Permit Evaluation Findings: <br />8. The proposed project is not expected to have any significant impact on traffic or parking <br />conditions since no change in the school population is expected. <br />9. The proposed project will not produce any permanent noise, glare, odors, vibration, <br />smoke, dust, air pollution, heat, liquid, or solid waste. <br />10. The proposed project will not impact storm water runoff since impervious coverage of the <br />property is not being significantly increased. <br />11. The proposed project is not expected to have any impacts on school population or density. <br />12. The proposed project will not impact visual and land use compatibility with surrounding <br />land because of the distance between the athletic field improvements and the nearest <br />residential property. <br />13. The park dedication fee is not applicable to this application. <br />14. The proposed project does not conflict with the general purpose and intent of the Zoning <br />Code or the Comprehensive Development Plan for the City.