My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
09-26-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2016 2:47:27 PM
Creation date
9/23/2016 2:42:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />City Council Meeting for September 26, 2016 <br />P:\Planning\Planning Cases\2016\PC 16-022 - 1500 Arden Place - Variance\Memos_Reports_16-022 <br /> <br />Page 2 of 5 <br />from the ordinary high water level except where the adjoining lots have structures setback at a <br />distance greater than 50 feet. In these cases, the Zoning Code requires the lakeshore setback be <br />determined by taking the average setback of the two adjacent dwellings and subtracting 10 feet. <br />The required lakeshore setback for 1500 Arden Place has been calculated at 80 feet – 2 inches. A <br />variance is needed for the dwelling to encroach 15 feet – 9 inches into this required setback. <br />Decks may extend up to six feet into a required structure setback, and in this case a deck could <br />be 74 feet – 2 inches from the shoreline. A portion of the deck on the south side of the house <br />would extend 15 feet – 4 inches into this setback. Additionally, a corner of the attached garage <br />would encroach 2 feet into the 40-foot minimum front yard setback. <br /> <br />The applicants have submitted a letter describing the project in more detail and addressing each <br />of the variance criteria (Attachment A). The proposed site plan and preliminary building plans <br />are included in Attachments E and F. <br /> <br /> <br />Plan Evaluation <br /> <br />A full evaluation of the proposal was presented to the Planning Commission at their meeting on <br />September 7, 2016. The staff report to the Planning Commission is included in Attachment I. <br /> <br /> <br />Additional Review <br /> <br />Building Official <br />The Building Official has reviewed the plans and has no additional comments at this time. A <br />Building Permit will be required prior to construction. <br /> <br />City Engineer <br />The City Engineer has reviewed the plans and has no additional comments at this time. A <br />Grading and Erosion Control Permit will be required prior to construction. <br /> <br />Rice Creek Watershed District <br />The Rice Creek Watershed District has reviewed the proposed project and determined that no <br />permit will be required. <br /> <br />Minnesota Department of Natural Resources <br />Municipalities are required to provide the Minnesota Department of Natural Resources (DNR) <br />with a copy of the variance request for properties within designated shoreland areas at least 10 <br />days before the public meeting. Staff notified the DNR about this application on August 24, <br />2016. No comments have been provided by the DNR at this time. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.