Laserfiche WebLink
AGENDA ITEM—9C <br /> include the expansion of the south parking area on the property. The proposed improvements <br /> in Phase 1 will decrease the landscaping coverage from 71.55% to 64.36% and increase the <br /> impervious coverage from 31.39% to 35.64%. The Master PUD and future Phase 2 of the <br /> project suggests structure coverage of 7.85%, landscaping coverage of 58.4%, and a total <br /> impervious coverage of 41.6%. Within the I-1 Limited Industrial District the City Code <br /> permits maximum structure coverage of up to 30%, a minimum landscaping coverage of <br /> 35%, and a total maximum impervious coverage of 65%. <br /> Permitted Existing Proposed Phase 1 Future Phase 2 <br /> Structure Coverage 30%Max. 5.62% --** 8.07% <br /> (619,073 sf) (116,109 sf) (166,553 sf) <br /> Landscaping Coverage 35%Min. 71.55% 64.36% 57.25% <br /> (722,252 sf) (1,476,507 sf) (1,328,119 sf) (1,238,490 sf) <br /> Total Impervious Coverage* 65%Max. 31.39% 35.64% 42.75% <br /> (1,341,325 sf) (647,833 sf) (735,497 sf) (882,142 sf) <br /> *Total impervious coverage includes the building coverage. <br /> **No new structures are being constructed with Phase 1 of the project. The Master PUD and Phase 2 of the project <br /> suggests a new 4 story office structure with a footprint of 50,444 square feet. <br /> ***The lot is 47.37 acres or 2,063,577.7 square feet. <br /> B. Floor Area Ratio (FAR)—Meets Requirements <br /> The FAR is the sum of the gross horizontal area of all floors of a building as measured in <br /> square feet from the exterior sides of the exterior walls, but not including covered porches; <br /> decks; any space where the average floor-to-ceiling height is less than six feet; attached or <br /> detached garages; and other detached accessory structures. FAR is calculated by dividing the <br /> sum of all gross horizontal floor areas by the square footage of the lot. <br /> Within the I-1 — Limited Industrial District, a total FAR of up to 60% is permitted for <br /> structures. Although Phase 1 of the project does not include any new structures, the Master <br /> PUD and Phase 2 of the project suggest a new four (4) story office building with an <br /> additional 155,000 square feet. When the future Phase 2 of the project is completed and <br /> combined with the existing square footage on the property, a total FAR of 20.3% is proposed <br /> with approximately 418,800 square feet of floor area. <br /> Permitted Existing Proposed Phase 1 Future Phase 2 Total <br /> FAR 60% 12.78% --* 7.51% 20.3% <br /> Square feet 263,800 --* 155,000 418,800 <br /> *No new structures are being constructed with Phase 1 of the project. The Master PUD and Phase 2 of <br /> the project suggests a new 4 story office structure that would add approximately 155,000 square feet of <br /> floor area. <br /> **The lot is 47.37 acres or 2,063,577.7 square feet. <br /> City of Arden Hills <br /> City Council Meeting for June 27, 2016 <br /> P:IPlanningWlanning Cases120161PC 16-014-Land O'Lakes-PUDWemos Reports_16-014 <br /> Page 4 of 14 <br />