My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
06-27-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:52:59 AM
Creation date
11/3/2016 11:32:54 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM—9C <br /> C. Building Height—Meets Requirements <br /> The maximum building height within the I-1 — Limited Industrial District Zoning District is <br /> 35 feet. During Phase I of the project no additional structures will be constructed on the site. <br /> Flexibility in building height will be required for Phase 2 of the project as a building height <br /> of approximately fifty-six (56) feet is being suggested at this time. The original PUD that <br /> was approved in 1979 in Planning Case 79-004 permitted the east building to be constructed <br /> at a height of fifty-six (56) feet. <br /> Zoning Code Existing Proposed Phase 1 Future Phase 2 <br /> Building Hei ht 1 35' 56' 1 56' <br /> *No new structures are being constructed with Phase 1 of the project. The Master PUD and Phase 2 <br /> of the project suggests a new 4 story office structure at approximately 56 feet in height. <br /> D. Setbacks—Meets Requirements <br /> The minimum building setbacks in the I-1 — Limited Industrial District include a 55 foot <br /> front yard setback, 20 foot rear yard setback, 20 foot side yard setbacks, and a 50 foot side <br /> yard corner setback where applicable. Although Phase 1 of the project does not include any <br /> new structures, the Master PUD and future Phase 2 of the project includes a new office <br /> building. As proposed, the new structure proposed in Phase 2 of the Master PUD will meet <br /> all setback requirements. <br /> Permitted Existing Proposed Phase 1 Future Phase 2 <br /> Front Yard Setback 55' 400' --* 390' <br /> Rear Yard Setback 20' 436' --* 436' <br /> Side Yard Setback(East) 20' 103' --* 103' <br /> Side Yard Setback(West) 20' 1 561' 1 561, <br /> Side Yard Corner(East) 50' 1 619' 1 619' <br /> *No new structures are being constructed with Phase 1 of the project. The Master PUD and Phase 2 of the <br /> project suggests a new 4 story office structure. <br /> Section 1325— General Regulations <br /> A. Tree Preservation—Meets Requirements <br /> The applicant submitted a Tree Survey and Tree Replacement Plan as part of their tree <br /> preservation and mitigation requirements (Attachment B). The following table outlines these <br /> numbers and the additional requirements of the tree preservation ordinance pertaining to tree <br /> removal and tree mitigation regulations. <br /> City of Arden Hills <br /> City Council Meeting for June 27, 2016 <br /> P:IPlanningWlanning Cases120161PC 16-014-Land O'Lakes-PUDWemos Reports_16-014 <br /> Page 5 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.