Laserfiche WebLink
<br />City of Arden Hills <br />City Council Meeting for January 9, 2017 <br /> <br />Page 6 of 17 <br />Lot 1 is a corner lot with 345.81 feet of frontage on County Road F and 166.74 feet of <br />frontage along Lexington Avenue. The lot width is measured along Lexington Avenue, and <br />lot depth is measured along County Road F. These dimensions meet the zoning district <br />requirements. <br /> <br />Lot 2 is unique, in that it has no frontage on any public road. This will be permitted as one of <br />the deviations from the subdivision requirements allowed by the PUD. Lot 2 has a width of <br />152.03 feet and a depth of 288.75 feet. This meets all requirements except the lot frontage <br />requirement. <br /> <br />Lot 3 has 228.0 feet of frontage on Lexington Avenue. The depth for this parcel is 199.6 feet. <br />These dimensions meet district requirements. <br /> <br />C. Building Coverage and Landscaped Lot Area – Meets Requirements <br /> <br />The applicant has submitted a comprehensive site plan for the Master PUD. As indicated, <br />site improvements to be completed during Phase 1 include the demolition of the existing <br />bank and the construction of the new bank building. The Phase 1 Landscaping Plan includes <br />the removal of a significant portion of the trees on site. Landscaping for the multi-tenant <br />commercial and daycare buildings will be completed in future phases. <br /> <br />Within the I-1 Limited Industrial District the City Code permits maximum structure coverage <br />of 30%, a minimum landscaping coverage of 35%, and a total maximum impervious <br />coverage of 65%. Because the site is being developed as a Master PUD, the site as a whole is <br />expected to conform to the structure and landscape coverage requirements for the I-1 District <br />while individual lots within the PUD may exceed the underlying requirements. The plan <br />proposed is under the maximum allowable structure and impervious surface coverage for the <br />entire site and is over the landscape coverage minimum. <br /> <br /> Permitted Master PUD <br />Structure Coverage 30% Max. <br />(63,9527 sf) <br />13.39% <br /> (18,250 sf) <br />Landscaping Coverage 35% Min. <br />(63,957 sf) <br />62.02% <br />(132,227 sf) <br />Total Impervious Coverage 65% Max. <br />(138,574 sf) <br />38.0% <br />(80,965 sf) <br /> <br /> <br />D. Floor Area Ratio (FAR) – Meets Requirements <br /> <br />The FAR is the sum of the gross horizontal area of all floors of a building as measured in <br />square feet from the exterior sides of the exterior walls. FAR is calculated by dividing the <br />sum of all gross horizontal floor areas by the square footage of the lot. <br />