Laserfiche WebLink
never constructed and the approval has since expired. A Variance was needed in this case to <br /> allow the parking area to encroach within the five-foot setback from the side property line. Staff <br /> has recommended that CSM apply for the proposed parking expansion through the PUD process <br /> given that the properties currently function as a planned unit development and in order to clean <br /> up the past planning case history for the site. <br /> 1. Overview of Request <br /> CSM has requested a Master PUD that would cover the four lots within the existing Arden Hills <br /> Corporate Center and a Final PUD for the construction of additional parking stalls to meet the <br /> needs of their existing tenants. The proposed parking expansion would include new stalls located <br /> in several areas throughout the properties. Parking would be accessible to all tenants within the <br /> development: <br /> • 14 stalls along the western side of Parcel I <br /> • 8 stalls in the northwestern corner of Parcel 2 <br /> • 22 stalls along the southwestern side of Parcel 2 <br /> • 15 stalls in the northwestern corner of Parcel 3 <br /> The applicant has submitted a development plan set including an overall site plan, grading plan, <br /> and landscape plan (Attachment Q. <br /> 2. Planned Unit Development(PUD) Process: <br /> The Planned Unit Development process is a tool that provides additional flexibility for <br /> development that an underlying zoning district would not otherwise allow. For example, a PUD <br /> may make exceptions to setbacks, lot coverage, parking requirements, signage, or landscaping <br /> requirements. It is intended to overcome the limitations of zoning regulations and improve the <br /> overall design of a project. While the PUD process allows the City to negotiate certain aspects of <br /> the development, any conditions imposed on the PUD must have a rational basis related to the <br /> expected impact of the development. A PUD cannot be used to permit uses that would not <br /> otherwise be permitted in the underlying zoning district. <br /> If a PUD is comprised of multiple lots, it is often treated as one continuous development. The <br /> development as a whole would be expected to meet the landscaping and structure coverage, and <br /> other similar requirements. For example, one property in the PUD may have 60 percent building <br /> coverage, but the development as a whole may not exceed 50 percent building coverage to <br /> maintain conformance with the underlying zoning district. <br /> The PUD development process is often comprised of multiple steps. The first step is the Master <br /> PUD, which is a detailed concept plan for the entire development outlining the individual phases <br /> over a period of time. A Final PUD proposal is then submitted prior to the development of each <br /> phase of the project. In this case, The Master and Final PUD are being applied for concurrently <br /> City of Arden Hills <br /> Planning Commission Meeting for May 3,2017 <br /> P:WlanninglPlanning Cases120171PC 17-012-4255-4295 Lexington Avenue-CSM-Master and Final <br /> PUDIMemos Reports 17-012 <br /> Page 2 of 9 <br />