My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-22-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
05-22-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 12:23:03 AM
Creation date
5/18/2017 2:51:34 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br /> • = BOLTON 8.- MBN I< , INCo <br /> Consulting Engineers & Surveyors <br /> 12224 Nicollet Avenue• Burnsville, MN 55337 <br /> Phone(952)890-0509• Fax(952)890-8065 <br /> www.bolton-menk.com <br /> December 11, 2015 <br /> John Anderson, P.E. <br /> Acting Public Works Director/City Engineer <br /> City of Arden Hills <br /> 1245 West Highway 96 <br /> Arden Hills, MN 55112-5743 <br /> Re: Lift Station 11 <br /> Arden Hills, Minnesota <br /> Dear Mr. Anderson, <br /> Thank you for providing us this opportunity to assist you with the replacement plans for Lift Station 11. <br /> Bolton & Menk, Inc. has the technical expertise, experience and resources to complete this project for <br /> the City and we appreciate your consideration. <br /> Based on the information we discussed during our meeting on November 19, 2015 the project will <br /> consist of the following major components: <br /> • Replacement of the existing wet well/dry well lift station <br /> • Installation of a new precast lift station and valve vault <br /> • Installation of two, new submersible pumps <br /> • New control panel and SCADA equipment <br /> • Miscellaneous piping and site work <br /> We have identified three (3) tasks in order to complete the work as described above. A summary of the <br /> tasks are described below. <br /> Task 1—Preliminary Design Phase <br /> • Kickoff meeting <br /> • Assemble and review existing site data (surveys, preliminary plans, as-built information, etc.) <br /> • Topographic survey <br /> • Geotechnical evaluation <br /> • Complete preliminary design summary <br /> Task 2—Final Design/Bidding Phase <br /> • Prepare final plans and specifications <br /> • Design review meetings with City staff <br /> • Construction cost estimates <br /> N:AProposals\Arden HillsTift Station 11\lift station 11 proposal Itr.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.