My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-03-2016 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2016
>
02-03-2016 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2017 4:52:59 PM
Creation date
6/6/2017 4:43:24 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />Planning Commission Meeting for February 3, 2016 <br />P:\Planning\Planning Cases\2016\PC 16-004 - Boston Scientific - Site Plan Review\Memos_Reports_16-004 <br /> <br />Page 1 of 9 <br /> MEMORANDUM <br /> <br />DATE: February 3, 2016 PC Agenda Item 3.A <br /> <br />TO: Planning Commission <br /> <br />FROM: Matthew Bachler, Senior Planner <br /> <br />SUBJECT: Planning Case #16-004 – No Public Hearing Required <br /> Applicant: Boston Scientific Corporation <br /> Property Location: 4100 Hamline Avenue North <br /> Request: Site Plan Review – Skyway Connection and Parking Lot Modification <br /> <br /> <br />Requested Action <br /> <br />Boston Scientific has requested a Site Plan Review to construct a skyway between Buildings 3 <br />and 10 on their campus. The proposal includes minor modifications to the parking lot on the <br />north side of Building 10 to accommodate the construction of the skyway. <br /> <br /> <br />Background <br /> <br />The Boston Scientific campus at 4100 Hamline Avenue North operates under a Planned Unit <br />Development (PUD) that was originally approved in 2002 for the Guidant Corporation. The last <br />comprehensive update to the PUD and Campus Master Plan took place in 2015 when the City <br />approved a subdivision of the property to help facilitate the sale of Buildings A, B, and C located <br />in the southwest corner of the campus (Planning Case 15-001). The Campus Master Plan was <br />revised at this time to make adjustments to the location of future buildings and parking ramps so <br />that the two new lots could function independently. Lot 1 includes Buildings A, B, and C and a <br />parking ramp and is currently being marketed to potential buyers. Lot 2 will continue to function <br />as the Boston Scientific campus. <br /> <br />New building construction or site modifications identified on the approved Campus Master Plan <br />require the submittal of a Site Plan Review application prior to construction. The Master Plan <br />shows a skyway between Buildings 3 and 10 connecting through the future Buildings J and M <br />(Attachment D). The proposed skyway is generally aligned with what is shown on the Master <br />Plan. The required modifications to the parking lot on the north side of Building 10 are <br />consistent with the Master Plan, which indicates this surface parking lot will eventually be
The URL can be used to link to this page
Your browser does not support the video tag.