Laserfiche WebLink
pond/wetland areas comprising 4.5 acres, and existing and proposed development <br />approximately 18.5 acres. Based on the need to provide 1676 stalls on the campus site to <br />support expansion, it has required the proposed parking expansion into the wooded area on the <br />west edge of the site, thus reducing this natural feature from approximately 7.5 acres to 4.2 <br />acres. Based on the impacts to the western wooded area, it has been determined that the <br />design will try and limit any additional impacts to natural site features by limiting some of the <br />landscaped islands at the outer edges of the parking areas. By creating landscaped islands <br />throughout the outer edges of the parking lots where they are not currently proposed, we <br />would effectively be removing parking stalls, which would require us to remove more of the <br />wooded area to the west to provide parking stalls that were removed to accommodate <br />landscaped islands. To mitigate the loss of the landscape islands, the site design has <br />incorporated a new east-west “green belt” (green belt is approximately 60’ in width and runs <br />the entire length of the proposed Phase 2 improvements) located directly north of the proposed <br />corporate building expansion. This wooded green belt will provide two site amenities; the first <br />being an enhanced entry experience for staff and visitors to the site (imagine exiting your car <br />and walking thru the woods to the front door of the new corporate building), and secondly, <br />provide a view into a natural landscaped area for users in the new corporate building (existing <br />buildings on the site have been designed to maximize views to natural areas and limit views to <br />the parking lots). <br />2. As part of the proposed work in Phase 1 (South parking lot), we have defined 18,172 sf. of <br />planting islands, which would exceed the current zoning code by approximately 150%. The <br />combined Phase 1 and Phase 2 parking lot islands would average to approximately 7.62% of the <br />total parking lot areas on site, which is significantly closer to the required 10%. <br /> <br /> <br />Project Schedule <br />The project will occur July 2016 – January 2019. See schedule below for additional detail. <br /> <br />Land O'Lakes Headquarters Consolidation <br />Project Schedule <br /> <br /> <br />TASK START FINISH <br />Preconstruction Planning & Design 01/04/2016 06/02/2017 <br />Schematic Design 01/04/2016 04/01/2016 <br /> <br />PUD Applications <br />South Lot Final PUD Application Submittal 05/02/2016 <br />Campus Master PUD Application Submittal 05/02/2016 <br />Campus Final PUD Application Submittal 06/06/2016 <br /> <br />Design Development 04/04/2016 07/13/2016 <br /> <br />Construction Documents 04/04/2016 06/02/2017 <br />