Laserfiche WebLink
<br />City of Arden Hills <br />Planning Commission Meeting for July 6, 2016 <br /> <br />P:\Planning\Planning Cases\2016\PC 16-016 - Land O'Lakes - Final PUD Phase 2\Memos_Reports_16-016 <br />Page 8 of 15 <br />the total parking and driving areas on the property will be occupied by planting islands. In <br />this case, the applicant is requesting flexibility to reduce the amount of planting islands to <br />7.62 percent. <br /> <br /> Zoning Code Phase 1 Proposed <br />Phase 2 <br />Total <br />Percent (%) of Planting Islands 10% Min. 14.89% 5.9% 7.62% <br />Square feet of Planting Islands 63,494 18,172 30,240 48,412 <br />Square feet of Parking Lot -- 122,054 512,886 634,940 <br /> <br />D. Off Street Parking Spaces – Meets Requirement <br /> <br />The number of parking stalls required by the City Code is determined based on the type of <br />land use proposed for a site. In this case, Land O’Lakes is classified as an office use and is <br />required to provide one (1) parking space for each 250 square feet of gross floor area. <br /> <br />With the proposed construction of the new 155,000 square foot four (4) story office building <br />in Phase 2, a total of 1,676 parking spaces are required by the Code for the entire site. In this <br />case, the applicant is proposing that an additional 519 parking spaces be constructed on the <br />north side of the campus for a total of 1,677 parking spaces within the site. With the <br />approval of Phase 1 by the City Council on June 27, 2016, the applicant was permitted to <br />expand the south parking lot to 267 parking spaces. In Phase 2 the applicant is also <br />requesting 461 proof-of-parking spaces be provided on the west side of the site for future <br />expansion (Attachment B page L04-10). A Site Plan Review application would be required <br />by the Planning Commission and City Council in order for the proof-of-parking to be <br />constructed in the future. <br /> <br /> Building <br />Square <br />Feet <br />Parking Ratio Required <br />Parking <br />Existing/Proposed <br />Parking <br />Existing <br />Office 263,800 1 per 250 sq. ft. 1,056 931 <br />(North Lot = 891) <br />(South Lot = 40) <br />Approved Phase 1* <br />Office 263,800 1 per 250 sq. ft. 1,056 267 <br />South Parking Lot (Increase of 227) <br />Proposed Phase 2** <br />Office 155,000 1 per 250 sq. ft. 620 1,410 <br />North Parking Lot (Increase of 519) <br />Proof of Parking (POP) <br /> 461 <br />Total <br />Proposed 418,800 1 per 250 sq. ft. 1,676 1,677 <br />Proposed with POP 2,138