My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-06-2016 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2016
>
07-06-2016 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 9:56:04 AM
Creation date
6/7/2017 10:47:26 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />Planning Commission Meeting for July 6, 2016 <br /> <br />P:\Planning\Planning Cases\2016\PC 16-016 - Land O'Lakes - Final PUD Phase 2\Memos_Reports_16-016 <br />Page 7 of 15 <br /> Caliper Inches Number of Trees <br />Approved Phase 1 <br />Proposed Removal 782 75 <br />Trees Preserved 30,854 2,473 <br />Proposed Phase 2 <br />Proposed Removal 7,800 564 <br />Trees Preserved 23,054 1,819 <br />Entire Site <br />Existing Significant Trees 31,636 2,548 <br />10% Permitted Removal 3,164 255 <br />Proposed Removal 8,582 729 <br />Total Trees Preserved 19,890 1,564 <br />Replacement Trees Required* 2,709 --** <br />Replacement Trees Proposed 2,728 780 <br />* Replacement trees are calculated by subtracting the ten percent permitted removal from the proposed <br />removal and dividing by two. <br />** The number of trees required may vary depending on the size of the trees planted by the developer. City <br />Code requires a certain number of caliper inches to be planted. If larger trees are planted then fewer trees <br />would be required. <br /> <br /> <br />A variety of trees species and tree sizes are proposed to be planted during Phase 2 of <br />construction. The proposed trees plantings consist of Red Maple, Sugar Maple, Ironwood, <br />Common Hackberry, Quaking Aspen, White Oak, Northern Pin Oak, Bur Oak, Northern Red <br />Oak, Basswood, and Prairie Expedition Elm. <br /> <br />B. Perennials and Shrubberies – Meets Requirements <br /> <br />The City Code requires that at least ten (10) percent of the total landscaped area be covered <br />with perennials and/or shrubbery. With the completion of Phase 2 of the project, a total of <br />225,395 square feet or 18.19% of the landscaped area will be covered by perennials and <br />shrubberies. <br /> <br /> <br /> Zoning Code Phase 1 Proposed <br />Phase 2 <br />Total <br />Percent (%) of Plantings 10% Min. 2.98% 14.99% 18.19% <br />Square feet of Plantings -- 39,632 185,763 225,395 sf. <br />Total Landscaped Area -- 1,328,119 sf. 1,238,490 sf. 1,238,490 sf. <br /> <br />C. Planting Islands – Flexibility Requested <br /> <br />At least ten (10) percent of a parking and driving area must be occupied by planting islands <br />that are at least 150 square feet in size and have at least one tree. Phase 2 of the project <br />proposes that after the expansion and reconfiguration of the north parking lot, 7.62 percent of
The URL can be used to link to this page
Your browser does not support the video tag.