My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-04-14 JDA
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2014
>
08-04-14 JDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2017 4:25:23 PM
Creation date
6/12/2017 4:23:11 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joint Development Authority <br /> TCAAP Redevelopment Project <br /> <br /> <br /> <br /> <br />DATE: August 4, 2014 <br /> <br />TO: Joint Development Authority Board of Commissioners <br /> <br />FROM: Beth Engum, Ramsey County Project Manager <br /> <br />SUBJECT: Infrastructure Study Update <br /> <br />Budgeted Amount: Actual Amount: Funding Source: <br />n/a n/a n/a <br /> <br /> <br />The Kimley-Horn/Wenck team is moving full-speed ahead with analysis and preliminary design of the <br />TCAAP site infrastructure. Progress has been made on a majority of the tasks. Boundary and <br />topographic survey of the site are substantially complete. Having this information will aid in the analysis <br />of existing site conditions and design of infrastructure. <br /> <br />Gathering of existing data as well as coordination with Rice Creek Watershed District (RCWD) has begun <br />for wetland and stormwater design and permitting. The first step toward development of the green <br />spine is drafting of a comprehensive stormwater management plan, which will go to the RCWD Board <br />for approval this fall. <br /> <br />Data gathering and analysis for the site sanitary sewer and watermain is underway. Conversations with <br />private utility providers (electric, gas, communications, cable) will begin in the next month in order to <br />coordinate distribution facilities with public infrastructure. <br /> <br />Preliminary spine road design discussions have begun with development of a roadway typical section <br />and alignment. Significant progress on design of the spine road will occur over the next two months. <br /> <br />A roundabout concept has been developed for the intersection of Old Highway 8 and County Road I in <br />order to provide local and emergency access from the thumb to the north. The one- lane roundabout, <br />which proposes to combine the County Road I intersections with Old Highway 8 and the 35W <br />ramps/Rice Creek Parkway, has been well received by Shoreview, MnDOT, and FHWA staff. The next <br />step in the preliminary design of these intersection improvements is preparation of a geometric layout <br />for MnDOT approval in the coming months. <br /> <br /> <br /> <br /> <br />AGENDA ITEM 6a <br /> <br /> <br />MEMORANDUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.