My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-26-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
06-26-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2017 4:37:17 PM
Creation date
6/22/2017 4:32:07 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
477 Temperance Street | St. Paul, MN 55101 | (651) 286-8450 <br /> <br /> <br />Building a legacy – your legacy. <br />Equal Opportunity Employer | wsbeng.com <br /> <br /> <br />June 22, 2017 <br /> <br /> <br />City of Arden Hills <br />Attn: Sue Polka, Public Works Director/City Engineer <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />RE: 0.5 MG Water Tower Rehabilitation <br />Construction Services <br /> <br />Dear Ms. Polka, <br /> <br />We appreciate the opportunity to submit this letter proposal to the City of Arden Hills to provide <br />construction services for the rehabilitation of the City’s 0.5 MG Water Tower. We will provide the <br />following services for this project: <br /> <br />I. CONSTRUCTION SERVICES <br />1. Construction Administration <br />We will serve as the City’s professional representative at the project site. Our proposal includes <br />project management and contract administration throughout construction. We will provide the <br />following construction administration tasks throughout the construction period: <br /> <br />a) Attend and conduct a pre-construction conference with the Contractor and City Staff. <br />b) Review and distribute all shop drawings submitted by the Contractor. <br />c) Review and make recommendation for applications for payment submitted by the <br />Contractor. <br />d) Administer the contract and prepare modifications as necessary. <br />e) Communicate with the Resident Project Representative (RPR), and the City as necessary. <br />f) Prepare and distribute contractor punch lists. <br />g) Maintain office files for shop drawings, field inspection reports, applications for payment, <br />field orders, change orders, etc. <br />2. Construction Observation <br />The construction observer will serve the following roles for this project: <br /> <br />a) Serve as the liaison with the Contractor’s Superintendent. <br />b) Provide full time construction observation and determine if the work is proceeding in
The URL can be used to link to this page
Your browser does not support the video tag.