Laserfiche WebLink
City of Arden Hills - 2017 Trail/Watermain Projects – Final Design & Bidding <br />September 6, 2017 <br />Page 2 of 4 <br /> <br /> <br />Description of Services  <br />Final Design  <br />  <br />1. Final Design  <br />Final plans and specifications will be prepared for the project.  Specific work included with this task will be the  <br />development of the project documents including the updated plans and specifications for bidding.  The plans will  <br />detail the removals, location and grade of the trail extension, pedestrian connections, restoration, erosion control,  <br />and SWPPP documentation. Documentation for the necessary permits will also be prepared along with an  <br />engineer’s opinion of probable cost.  The City added approximately 600 feet of watermain along County Road E2;  <br />engineering services for this work including surveying and final design have been added to the total fee.  <br />  <br />The plans will be provided to MnDOT for State Aid review and approval as well as Ramsey County for their required  <br />review and permitting.  We understand that no federal funding will be obtained and therefore the project will not  <br />be required to meet Federal design/construction guidelines.  Permitting through the Rice Creek Watershed District  <br />will be required to complete the project.  The proposed alignment and design of the CR E2 trail will trigger a number  <br />of the RCWD rules as well, and the necessary scope of work for this task has been included.  Plans will also be  <br />provided to Bethel University for final review and comment during this phase.  <br />  <br />2. Coordination with MnDOT, Ramsey County, & Bethel University  <br />Each of the trail segments is within Ramsey County right‐of‐way and it will be critical to the success of this project  <br />for WSB to lead communication and coordination efforts to facilitate the design and construction of the new trail  <br />segments.   WSB will hold one project meeting with Ramsey County and one with Bethel University during the  <br />design process, either at City Hall or County/Bethel offices. This will include coordination of right‐of‐way and  <br />anticipated disturbances, if needed. We will provide the necessary graphics, maps, and presentation materials for  <br />these meetings.  In addition, email correspondence, conference calls, and other related day‐to‐day communications  <br />techniques will be used.  The portion of the trail project along Old Snelling Avenue will be designed and constructed  <br />in accordance with State Aid standards; the appropriate level of communication with MnDOT is also included with  <br />the scope of work.  <br />  <br />3. Project Meetings/City Council Meetings  <br />WSB will continue to hold project meetings with City staff as well as stakeholders as needed during the final design  <br />process. Prior to the final acceptance of the design and specifications, we will attend a second City Council meeting.    <br />  <br />WSB will work with City staff to develop and mail the required notices for project meetings and prepare any  <br />necessary resolutions for City Council meetings.  We will provide the necessary graphics, maps, and presentation  <br />materials to be used at the hearing or City Council meeting.  <br />  <br />4. Project Bidding Services  <br />WSB will prepare advertisement for bids, respond to contractor questions, receive bids, provide a bid tabulation,  <br />evaluate qualifications, and provide an award recommendation to the City.  <br />  <br />