Laserfiche WebLink
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2018 2022thru Department Water Department <br /> Description <br />The City has two water towers; a 500,000 gallon north tower and a 1,000,000 gallon south tower. Based on a 2005 inspection report some <br />improvements are needed at the south tower. The north tower was last inspected in 2000 and repairs were undertaken in 2001. <br />In 2012 both water towers were inspected inside and outside using the "float down" method by Kollmer Consultants, inc of Stacy MN. Based upon <br />these inspections the recommendation is to make minor structural modifications to each to towers together with a complete stripping of the existing <br />paint and a full repainting. Kollmer recommended that the south water tower be completed in the next 1 to 2 years and the north water tower be <br />completed in the next 2 to 3 years. <br />Costs have been updated with a new price of $520,000 for 2018. <br />Project #12-W-001 <br />Priority 3 Important <br /> Justification <br />New plans and specs have been updated as of 2017. <br /> Budget Impact/Other <br />Useful Life 15-17 <br />Project Name Water Towers Repair and Repainting Category Utility Maintenance <br />Type Operational Maintenance <br />TCAAP No <br />Total Project Cost:$520,000 <br />Total20182019202020212022Expenditures <br />520,000520,000Construction/Maintenance <br />520,000 520,000Total <br />Total20182019202020212022Funding Sources <br />520,000520,000Water Utility Funds <br />520,000 520,000Total <br />Wednesday, September 13, 2017Page 29Produced Using the Plan-It Capital Planning Software