My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-17-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
09-18-17-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2017 4:18:30 PM
Creation date
9/14/2017 4:11:31 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2018 2022thru Department Water Department <br /> Description <br />This item would construct an additional Water Booster Station near Old Highway 10 and I-694 to pump water from the low pressure zone to the <br />high pressure zone. The booster station would be built on excess Ramsey County right of way and the structure would be made to look like a <br />residential house due to its location. <br />This item was originally budgeted in 2017 and has been moved to 2018 per updated timeline. <br />Project #16-W-001 <br />Priority 3 Important <br /> Justification <br />The City's water system currently only has one booster station providing water to the high pressure zone through a single crossing of i-694. If <br />anything (lighting strike, wind storm, etc.) knocked out the current booster station for any length on time the high pressure zone could be out of <br />water after the half million gallon tower is drained. <br />Construction of a second booster station will provide needed redundancy in the system so if one booster station fails or is taken down for service <br />the high pressure zone will still be provided water. <br /> Budget Impact/Other <br />Useful Life 30 <br />Project Name TCAAP New Booster Station Category Utility Improvements <br />Type Improvement <br />TCAAP Yes <br />Total Project Cost:$1,000,000 <br />Total20182019202020212022Expenditures <br />1,000,0001,000,000Construction/Maintenance <br />1,000,000 1,000,000Total <br />Total20182019202020212022Funding Sources <br />1,000,0001,000,000TCAAP -WAC/SAC Charges <br />1,000,000 1,000,000Total <br />Wednesday, September 13, 2017Page 30Produced Using the Plan-It Capital Planning Software
The URL can be used to link to this page
Your browser does not support the video tag.