My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
09-25-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2017 11:54:32 AM
Creation date
9/22/2017 11:32:54 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Feasibility Report <br />Pavement Management Program <br />2018 Street and Utility Improvement Project <br />City of Arden Hills Project No. 18-STR-065 <br />WSB Project No. R-010111-000 Page 12 <br />5. FEASIBILITY, NECESSITY, AND COST EFFECTIVENESS <br /> <br />The improvements proposed in this study are necessary for a number of reasons. The <br />reconstruction of the streets provides the City with a cost-effective means of continuing the <br />City’s street improvement efforts and ensuring an adequate means of transportation for local <br />residents. In addition to rehabilitating roadway pavements, the project will allow for the <br />correction of existing drainage problems by increasing the cross-sectional crown and improving <br />the conveyance of runoff with a concrete curb and gutter system. These improvements will <br />provide a longer lasting street section needing less maintenance over time. <br /> <br />The proposed improvements constitute a project large enough to ensure a competitive bidding <br />environment, economy of scale, and are deemed to be cost-effective. Based on the information <br />contained within this report, the proposed improvements as described can be considered to be <br />necessary, cost-effective, and feasible from an engineering standpoint. The project feasibility is <br />subject to financial review by the City.
The URL can be used to link to this page
Your browser does not support the video tag.