Laserfiche WebLink
<br /> <br /> <br />Feasibility Report <br />Pavement Management Program <br />2018 Street and Utility Improvement Project <br />City of Arden Hills Project No. 18-STR-065 <br />WSB Project No. R-010111-000 Page 13 <br />6. CONCLUSIONS AND RECOMMENDATION <br /> <br />The 2018 Street and Utility Improvement Project was initiated by the Cit y’s PMP. Streets <br />proposed for improvements in 2018 are based on the current roadway conditions and includes <br />improvements meeting the minimum City standards defined by the Arden Hills Pavement <br />Management Philosophy. <br /> <br />Roadway reconstruction, consisting of removal of the existing bituminous pavement, subgrade <br />correction, addition of concrete curb and gutter, watermain replacement, sanitary sewer repairs, <br />and new bituminous pavement, is proposed along the following roadways: <br /> <br />▪ Indian Oaks Court between James Avenue and the cul-de-sac <br />▪ Indian Oaks Trail between Hamline Avenue North and the cul-de-sac <br />▪ West Floral Drive between Hamline Avenue North and the dead end <br />▪ James Circle between West Floral Drive and the cul-de-sac <br />▪ Gale Circle between West Floral Drive and the cul-de-sac <br />▪ Norma Circle between West Floral Drive and the cul-de-sac <br /> <br />Full depth reclamation with concrete curb and gutter repairs and limited storm sewer <br />improvements is proposed along the following roadways: <br /> <br />▪ Wedgewood Drive between Old S.T.H. 10 and the cul-de-sac <br />▪ Brueberry Lane between Old S.T.H. 10 and Parkshore Drive <br />▪ Parkshore Drive between Old S.T.H. 10 and the cul-de-sac <br /> <br />The total estimated cost for the 2018 Street and Utility Improvement Project is $3,301,192.51. <br />Proposed funding for the project is provided through a combination of Special Assessments and <br />City funds. <br /> <br />The proposed improvements constitute a project large enough to ensure a competitive bidding <br />environment, economy of scale, and are deemed to be cost-effective. Based on the information <br />contained within this report, the proposed improvements as described can be considered <br />necessary, cost-effective, and feasible from an engineering standpoint. <br /> <br />