Laserfiche WebLink
<br /> <br /> <br />Feasibility Report <br />Pavement Management Program <br />2018 Street and Utility Improvement Project <br />City of Arden Hills Project No. 18-STR-065 <br />WSB Project No. R-010111-000 Page 5 <br />A copy of the soil boring records and location map prepared for this project by WSB & <br />Associates, Inc., dated August 2017, may be found in Appendix D of this feasibility <br />report. <br /> <br /> 2.2.2 Sanitary Sewer <br /> <br />The existing sanitary sewer system in the project area consists of 8-inch-diameter <br />polyvinyl chloride pipe (PVC), 8-inch vitrified clay pipe (VCP), and 12-inch reinforced <br />concrete pipe (RCP). The existing sanitary sewer was televised and found to be in fair <br />condition with few cracks or sags in the pipes along most streets. The sanitary sewer <br />along Indian Oaks Trail is 12-inch RCP and is exhibiting signs of inflow and infiltration <br />(I/I) along cracks in the main pipe and at service connections. The 8-inch VCP sanitary <br />sewer on Indian Oaks Court is also experiencing I/I, based on the televising information. <br /> <br /> 2.2.3 Water Main <br /> <br />Per City record drawings, the existing water main in the project area consists of 6, 8, and <br />12-inch-diameter ductile iron pipe (DIP) installed when the road was originally <br />constructed. There is a history of water main breaks and corrosion of the bolts of the <br />water main fittings in the proposed project area. A summary of the water main is shown <br />in Table 2. <br /> <br />Table 2 – 2018 Street and Utility Improvement Project <br />Summary of Existing Water Main Conditions <br /> Street Name Pipe Size Pipe Material Number of Known Water <br />Main Breaks <br />Indian Oaks Court 6" Ductile Iron - <br />Indian Oaks Trail 6" Ductile Iron 2 <br />West Floral Drive 8" Ductile Iron - <br />James Circle 6" Ductile Iron - <br />Gale Circle 6" Ductile Iron 1 <br />Norma Circle 6" Ductile Iron - <br />Wedgewood Drive 6" Ductile Iron 1 <br />Brueberry Lane 6" Ductile Iron 1* <br />Parkshore Drive 12" Ductile Iron - <br />* Valve repair at intersection of Brueberry Lane and Parkshore Drive <br /> <br /> 2.2.4 Drainage <br /> <br />In the Parkshore neighborhood, runoff is collected by catch basins and conveyed through <br />the existing storm sewer system which ultimately discharges to Lake Valentine. <br />Settlements in some areas of the curb and gutter result in standing water after rain events. <br />