My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-23-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
10-23-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2017 2:32:47 PM
Creation date
10/20/2017 2:24:46 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 1 of 1 <br /> <br />DATE: October 23, 2017 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />William S. Joynes, Sr., City Administrator <br /> <br />FROM: Sue Polka, Public Works Director/City Engineer <br /> <br />SUBJECT: County Road F Watermain – Design and Bidding Services <br /> <br /> <br />Budgeted Amount: Actual Amount: Funding Sources: <br />Not Budgeted $15,782.00 <br /> <br />Water Utility Fund <br />Requested Action <br />Approve the scope and fee for final design and bidding services for the County Road F <br />Watermain in the amount of $15,782.00 (Attachment A). <br /> <br />Discussion <br />Ramsey County is designing a roadway improvements on County Road F between Hamline <br />Avenue and Lexington Avenue. The improvements include total reconstruction with the <br />addition of a center left turn lane, intersection improvements at Innovation Way, and a 10’ <br />sidewalk along the south side of County Road F. <br /> <br />The City has an 8” cast iron watermain between Hamline Avenue and Innovation Way. This <br />watermain was installed in 1971 and if left in place would be located beneath the southern curb <br />line of the proposed County Road F. Staff is proposing to replace the watermain with the <br />County’s roadway reconstruction project. The estimated construction cost of the proposed 8” <br />PVC C900 watermain is $150,000. <br /> <br />WSB has provided a scope and fee to provide final design and bidding services in the amount of <br />$15,782. <br /> <br />Attachments: <br />Attachment A: WSB Proposal for Contract Administration and Construction Inspection <br />CONSENT ITEM – 5K <br /> <br /> <br />MEMORANDUM <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.