My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-23-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
10-23-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2017 2:32:47 PM
Creation date
10/20/2017 2:24:46 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800 <br /> <br /> <br /> <br /> <br /> <br />October 19, 2017 <br /> <br />Mr. William Joynes <br />City Administrator <br />City of Arden Hills <br />1245 W Highway 96 <br />Arden Hills, MN 55112 <br /> <br /> <br />Re: City of Arden Hills 2018 Watermain Improvements – County Road F <br /> Scope of Services to Provide Engineering for Project Design and Bidding Services <br /> <br />Dear Mr. Joynes: <br /> <br />We are pleased to present this proposal for professional engineering services to assist the City of Arden Hills with the <br />final design and bidding services for the 2018 Watermain Improvements (County Road F) in conjunction with Ramsey <br />County. The following outlines the scope of services and the associated engineering fees necessary to complete this <br />project. <br /> <br />General Project Scope <br /> <br />The scope of the project is to provide the watermain plans and specifications for inclusion in the County Road F <br />reconstruction plans in development by Ramsey County. The proposed project is located along County Road F from Hamline <br />Avenue to approximately 1000 feet east of Innovation Way. <br /> <br />Consultant services provided for this project include preparation of watermain plans for inclusion in the Ramsey County plan <br />set, utility specifications and bidding assistance for any utility related questions. The schedule for this work will be based on <br />the Ramsey project plans and coordinated with their needs. <br /> <br />Description of Services <br />Final Design & Bidding Services <br /> <br />1. Coordination with Ramsey County <br />The watermain improvement work is within Ramsey County right-of-way and will be included in their project plans. <br />WSB will work with Ramsey County to determine the final location of the watermain and avoid potential utility <br />conflicts. In addition, email correspondence, conference calls, and other related day-to-day communications <br />techniques will be used. <br /> <br />2. Utility Location <br />It is understood that the utility coordination and location information will be provided by Ramsey County. WSB will <br />work with Ramsey County to determine any necessary relocation work due to the watermain replacement. WSB will <br />also work with Ramsey County to determine final locations of above ground utilities to ensure there are no conflicts <br />with the proposed roadway improvements. As part of this work, it is understood that the topographic survey to <br />ensure the needed utility information and locations are incorporated into the project design will be provided to WSB <br />by Ramsey County. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.