Laserfiche WebLink
City of Arden Hills – 20430 Comprehensive Plan <br /> <br /> <br />Approved: September 28, 201609 Amended: December 12, 2016 <br />9-14 <br />o Snelling Avenue North (Old S.T.H. 10)– A proposed trail (Figure 9.1) <br />from the Hwy. 96 regional trail is recommended to provide a north-south <br />connection the intersection of Snelling Avenue North and County Road E2 <br />(segment F.1). Due to major highways, this route provides a critical <br />connection to several city parks, schools, and the Tony Schmidt Regional <br />Park. This would also provide a connection of the Round Lake proposed <br />trail connection if an easement was acquired south of Round Lake. <br /> <br />o Highway 9 6 – A grade separated trail connection may be needed at a <br />location between Highway 10 and Lexington Avenue. The grade- <br />separated connection would provide access to City Hall, the TCAAP area, <br />and the developed portion of the City south of Highway 96. A trail <br />crossing of Highway 10 could possibly be incorporated into the Highway <br />96 and 10 intersection when it is rebuilt. <br /> <br />o Highway 10 – Between Interstate 694 and the City border along Highway <br />10, a pathway crossing is needed. Two potential options for a grade <br />separated crossings: An area just south of Royal Hills Park and/or along <br />Highway 10 north of Highway 96. A minimum of one grade separated <br />crossing is desired. <br /> <br />o Interstate 35W – The City desires a pedestrian and bike bridge over <br />Interstate 35W. A specific location for this crossing needs to be identified. <br />This would be a crucial pathway crossing to connect the TCAAP area with <br />Long Lake Regional Park. <br /> <br />o Interstate 694 – A pathway crossing in Arden Hills is needed at Interstate <br />694. A final location(s) will be selected when Interstate 694 is <br />reconstructed; however, two potential locations include: <br /> Hamline Avenue/Highway 51 – A pathway across Interstate 694 <br />near Hamline Avenue/Highway 51 must be constructed when <br />Interstate 694 is reconstructed. <br /> Lexington Avenue – While there is a pathway on the Shoreview <br />side of the Lexington Avenue bridge, there is not a path on the <br />Arden Hills side of the bridge. When the Interstate 694 <br />reconstruction occurs, a pathway should be provided at this <br />location. <br /> <br />o Lake Valentine Road – The connection of a city path (segment G) on the <br />southern side of Lake Valentine Road is recommended to provide a safe <br />route for adjacent neighborhoods to the Mounds View High School and a <br />connection to newly redeveloped Valentine Park. <br />Formatted: No bullets or numbering <br />Formatted: Font: Bold <br />Formatted