Laserfiche WebLink
<br />_____________________________________________________________________________________________ <br />City of Arden Hills <br />Planning Commission Meeting for September 6, 2017 <br />P:\Planning\Planning Cases\2017\PC 17-023 - Master and Final PUD - Marriot Springhill Suites - 3920 <br />Northwoods Drive\Memos_Reports_17-023 <br /> <br />Page 2 of 15 <br />second to fourth floors show a floor area of approximately 15,939 square feet and 31 guest <br />rooms per floor. The fifth floor would be 15,667 square feet and include 31 guest rooms. Marriot <br />Springhill Suites guestrooms provide slightly more space than other chain hotels and include <br />separate areas for sleeping, working, and relaxing, as well as an in-suite microwave and <br />refrigerator. In total, the building would have a gross floor area of 79,241 square feet. The <br />overall height of the building would be approximately 58 feet. <br /> <br />The exterior of the building would be comprised of a variety of building materials, including <br />brick, stone, transparent glass, and EIFS. A porte chochere would constructed on the south side <br />of the hotel in front of the entrance lobby. New wall signage would be added on each side of the <br />building, and a new monument sign is proposed at the Northwoods Drive entrance. <br /> <br />Hawkeye Hotels expected to begin construction in late 2017 and open the hotel in 2018. The <br />applicant has provided a project narrative (Attachment A), civil plan set (Attachment D), and <br />architectural plan set (Attachment E). <br /> <br />2. Planned Unit Development (PUD) Process: <br /> <br />The Planned Unit Development process is a tool that provides additional flexibility for <br />development that an underlying zoning district would not otherwise allow. For example, a PUD <br />may make exceptions to setbacks, lot coverage, parking requirements, signage, or landscaping <br />requirements. It is intended to overcome the limitations of zoning regulations and improve the <br />overall design of a project. While the PUD process allows the City to negotiate certain aspects of <br />the development, any conditions imposed on the PUD must have a rational basis related to the <br />expected impact of the development. A PUD cannot be used to permit uses that would not <br />otherwise be permitted in the underlying zoning district. <br /> <br />The PUD development process is often comprised of multiple steps. The first step is the Master <br />PUD, which is a detailed concept plan for the entire development outlining the individual phases <br />over a period of time. A Final PUD proposal is then submitted prior to the development of each <br />phase of the project. In this case, The Master and Final PUD are being applied for concurrently <br />for the proposed hotel. There are no future development phases proposed at this time. <br />3. Surrounding Area: <br />Direction Future Land Use Plan Zoning Existing Land Use <br />North Right-of-Way (Interstate 694) Right-of-Way (Interstate 694) Right-of-Way (Interstate 694) <br />South Mixed Business B-3 – Service Business District Vacant <br />East Commercial B-3 – Service Business District Vacant <br />West Mixed Business I-Flex District Office, Medical Clinic <br /> <br />