My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-06-2017 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2017
>
09-06-2017 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2017 11:12:46 AM
Creation date
11/17/2017 11:04:04 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arden Hills Marriott Springhill Suites <br />Master PUD/ Final PUD Applications <br />August 7, 2017 <br />Page 3 <br /> <br /> <br />Stormwater treatment and volume control are provided in the adjacent regional pond. The <br />proposed stormwater management system will be submitted for permit to the Rice Creek <br />Watershed District. The proposed system will discharge via an existing storm pipe and flared <br />end section (FES) to the regional pond on the adjacent site, avoiding the need to disturb the <br />pond slope with the new project construction. <br />Included with this Application Form and Project Narrative are the following documents: <br />5 full size sets and 30 sets of 11” by 17” copies: <br />Preliminary Engineering and Landscaping Plans <br />Certified Survey (ALTA) <br /> Building Floor Plans <br /> Building Elevations <br /> Photometric Plan and Lighting Plan <br />Signage Plan <br /> <br />2 copies – Preliminary Stormwater Management Report <br /> <br />1 jump drive with the project application documents <br /> <br />Check for review fees
The URL can be used to link to this page
Your browser does not support the video tag.