Laserfiche WebLink
Arden Hills Marriott Springhill Suites <br />Master PUD/ Final PUD Applications <br />August 7, 2017 <br />Page 3 <br /> <br /> <br />Stormwater treatment and volume control are provided in the adjacent regional pond. The <br />proposed stormwater management system will be submitted for permit to the Rice Creek <br />Watershed District. The proposed system will discharge via an existing storm pipe and flared <br />end section (FES) to the regional pond on the adjacent site, avoiding the need to disturb the <br />pond slope with the new project construction. <br />Included with this Application Form and Project Narrative are the following documents: <br />5 full size sets and 30 sets of 11” by 17” copies: <br />Preliminary Engineering and Landscaping Plans <br />Certified Survey (ALTA) <br /> Building Floor Plans <br /> Building Elevations <br /> Photometric Plan and Lighting Plan <br />Signage Plan <br /> <br />2 copies – Preliminary Stormwater Management Report <br /> <br />1 jump drive with the project application documents <br /> <br />Check for review fees