Laserfiche WebLink
Arden Hills Marriott Springhill Suites <br />Master PUD/ Final PUD Applications <br />August 7, 2017 <br />Page 2 <br /> <br />3. Number of parking stalls required for a hotel is 1 per room (139) plus 1 per employee (12) for a <br />total of 151 stalls required. The project proposes 143 parking spaces, which is acceptable to the <br />hotel management and will allow appropriate operation of the facility. <br />4. Minimum parking lot island area is 10% of the parking area. The site plan provides ±8%, which is <br />the result of providing the 143 parking stalls that will allow the hotel to operate appropriately <br />and provide much needed accommodations in the area and is in the public interest. <br />5. Parking setback for the district is 5’. The site plan provides 5’ setback along the west, north and <br />south property lines. The proposed setback along the northwest property line along the open <br />space and pond is 3’. The proposed setback along the east property line is also 3’. <br />6. Required green space for the site is 25%. The site plan provides ±15% green space. When <br />considering the pond property adjacent to the northwest property line, the overall green space <br />intent of the Zoning Ordinance is provided. <br />7. Landscaping requirements include ±60 trees based on the caliper calculations in the code. Due <br />to the available green space area, the site plan includes 50 trees, which is the optimum number <br />that may be planted in a manner that is healthy for the trees. Additional shrubs may be planted <br />in lieu of the total required trees. The developer may also plant a portion of the tree <br />requirements on the adjacent city pond site and in the street right of way, if desired by the city. <br />8. Exterior Building Materials: Code requires that 75% of the exterior materials be stone, brick or <br />glazing. Flexibility to allow a minimum 55% has been requested for this project. The current <br />design of the project provides 57% of exterior materials that are high quality stone, brick and <br />glazing. <br /> <br />Site Information and Infrastructure Requirements <br /> <br />The site has direct access to Northwoods Drive. <br /> <br />A trip generation or traffic study is not provided for this project. The proposed use will result in <br />peak trips that are opposite the traffic peaks of the previous office use on the property and of <br />the adjacent office buildings and other businesses. The hotel patrons will leave the site in the <br />AM period before the occupants of the office buildings are arriving to work; the hotel patrons <br />will return to the hotel after the majority of the other buildings’ occupants leave the area during <br />the PM time frames. There will also be hotel patrons who will be working in the adjacent office <br />buildings and will walk to and from the hotel. Overall, there will be a reduction in traffic peaks <br />due to the change to hotel use. <br /> <br />There are no wetlands, shoreland or floodplain areas within the site. <br /> <br />Utility services will be provided from existing water and sewer services currently providing <br />utilities to the existing office building. Utility plans will be prepared that will meet city <br />requirements for permit. Gas, electric and communications are also available in the vicinity.