Laserfiche WebLink
ARDEN HILLS CITY COUNCIL – NOVEMBER 27, 2017 4 <br /> <br />5. The City has adopted the Guiding Plan for the B-2 District that outlines future <br />development principals for the area. <br />6. The City has adopted Design Standards for the B-2 District within the Zoning Code. <br />7. The proposed PUD Amendment is in substantial conformance with the requirements of the <br />City Code. The applicant has requested flexibility for the minimum number of stacking <br />spaces required for a fast food restaurant and for the wall signage copy area. <br />8. The proposed PUD Amendment is in conformance with the Guiding Plan for the B-2 <br />District. <br />9. The proposed PUD Amendment is in conformance with the Arden Hills 2030 <br />Comprehensive Plan. <br />10. The additional sign copy area requested for wall signage satisfies the Sign Standard <br />Adjustment criteria included in Section 1260.01 of the City Code. <br />11. The PUD process allows for flexibility within the City’s regulations through a negotiated <br />process with a developer. Where the plan is not in conformance with the City’s Zoning <br />Code, flexibility has been requested by the applicant and/or conditions have been placed <br />on an approval that would mitigate the nonconformity. <br />12. The proposed PUD Amendment is not anticipated to create a negative impact on the <br />immediate area or the community as a whole. <br /> <br />Senior Planner Bachler stated the Planning Commission voted to recommend approval (4-0) of <br />Planning Case 17-024 for a PUD Amendment at 1160 County Road E West, based on the findings <br />of fact and the submitted plans in the November 27, 2017, Report to the City Council, as amended <br />by the following seven (7) conditions: <br /> <br />1. The project shall be completed in accordance with the submitted plans as amended by the <br />conditions of approval. Any significant changes to these plans, as determined by the City <br />Planner, shall require review and approval by the Planning Commission and the City <br />Council. <br />2. The Developer shall obtain the required development permits within one year of the <br />approval date or the approval shall expire, unless extended by the City Council prior to the <br />approval’s expiration date. Extension requests must be submitted in writing to the City at <br />least 45 days prior to the expiration date. <br />3. A PUD Amendment Agreement shall be prepared by the City Attorney and subject to City <br />Council approval. The Agreement shall be executed prior to the issuance of any <br />development permits. <br />4. Final grading, drainage, utility, and site plans shall be subject to approval by the City <br />Engineer, Building Official, City Planner, and Fire Marshall prior to the issuance of a <br />Grading and Erosion Control Permit or other development permits. <br />5. A Sign Permit shall be required for each wall sign and the menu ordering board. <br />6. The relocated parking lot island shall be replanted to include a minimum of one (1) tree. <br />7. The Developer shall provide a total of 8.5 caliper inches of new tree plantings on the site. <br /> <br />Mayor Grant asked if the sign on the south of the building would be visible from the eStreet <br />flats. <br /> <br />Senior Planner Bachler reported the sign on the south building wall would not be visible from <br />the E Street Flats apartment building.