My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-18-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
02-12-18-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2018 4:26:19 PM
Creation date
2/1/2018 2:14:07 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: February 12, 2018 <br /> <br />TO: Honorable Mayor and City Councilmembers <br /> <br />FROM: Dave Perrault, City Administrator <br />Sue Polka, Director of Public Works/City Engineer <br /> <br />SUBJECT: Utility Rate Study and Capital Projects <br /> <br />Budgeted Amount: Actual Amount: Funding Source: <br />N/A N/A N/A <br /> <br />Council Should Consider <br /> <br />The City Council should provide direction on future capital projects as presented in the Ehlers <br />Rate Study. <br /> <br />Background <br /> <br />The City Council requested a Special Work Session to discuss 2018 capital projects as they <br />relate to the Ehlers Rate Study presented to the City Council at the January 16, 2018 Work <br />Session. Below are the upcoming capital projects, anticipated cost, and the reasoning as to <br />whether or not the project needs to be completed in 2018, or could be delayed. <br /> <br />WATER PROJECTS <br /> <br />Water Tower Repair & Repainting - $520,000 <br /> <br />A contract was awarded to Osseo Construction Co. at the June 26, 2017 City Council meeting. <br />The work is scheduled to begin in May of this year. <br /> <br />County Road E2 Water Replacement/Old Hwy 10 Loop - $855,000 <br /> <br />The current estimate for this work is $1,046,600. The increase in cost is due to additional <br />watermain replacement that is proposed for CR E2 due to an additional break in the line last <br />year. The estimate for CR E2 watermain replacement is $415,100. CR E2 could be delayed; <br />however, this watermain has had six breaks since 2015, and more are anticipated if not replaced. <br />The estimate for the loop in Old Snelling Avenue is $631,500. The loop is recommended to <br />AGENDA ITEMS –1A <br /> <br /> MEMORANDUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.