Laserfiche WebLink
provide redundancy in the system. While the project could be postponed, Ramsey County is <br />planning an overlay project on Old Snelling in 2019. If this project were delayed the work done <br />on Old Snelling after that time would require more costly pavement restoration. City Staff is <br />also seeking an independent opinion on the necessity of this loop, this information will be <br />provided at the Special Work Session. <br /> <br />Booster Station Repair/Upgrade (Roseville) - $400,000 <br /> <br />The City is contractually obligated to participate in the Booster Station upgrades. <br /> <br />County Road F Water Main Replacement - $300,000 <br /> <br />Ramsey County has a project to reconstruct County Road F between Hamline and Lexington in <br />the spring/summer of 2018. The existing watermain is cast iron pipe that was installed in 1969. <br />In addition, with the proposed widening of CR F, the watermain would be located directly <br />beneath the new concrete curb and gutter. The proposed watermain has been designed and <br />included in Ramsey County’s construction plans. If this project is delayed, the City will be <br />responsible for the replacement of the watermain and associated street repairs with the road the <br />County had just reconstructed. <br /> <br />Indian Oaks/Floral Dr PMP (2018 PMP) - $751,000 <br /> <br />Staff is proposing to replace all of the watermain in the Indian Oaks/Floral Drive neighborhood <br />with the 2018 PMP. The existing pipes are cast iron and were installed in 1971 and 1975. <br /> <br />SANITARY SEWER PROJECTS <br /> <br />Sewer Lining/Rehabilitation - $400,000 <br /> <br />A contract was awarded to Michels Pipe Services. Work is currently underway and should be <br />completed in March. A portion of the funding will be provided by the MCES I/I grant program. <br />This project is a rollover of $200,000 from 2017, the remaining $200,000 could be delayed for a <br />future project. <br /> <br />Indian Oaks/Floral Dr PMP (2018 PMP) - $270,000 <br /> <br />This work is included in the 2018 PMP and includes sanitary sewer pipe lining, manhole repairs <br />and adjustments. The lining portion of this project will also be partially funded by the MCES I/I <br />grant program providing for a cost savings. <br /> <br />STORM WATER PROJECTS <br /> <br />Indian Oaks/Floral Dr PMP (2018 PMP) - $560,000 <br /> <br />This work is in the 2018 PMP. Due to drainage complaints in the project area, additional storm <br />sewer pipe and pond modifications are required.