Laserfiche WebLink
ARDEN HILLS CITY COUNCIL—JANUARY 22, 2018 5 <br /> Hearing after a presentation by MnDOT staff and received the following comments from the <br /> public: <br /> • Council should consider the whole corridor and how it is affected. <br /> • Traffic from Highway 10/ Highway 96 is exiting onto Snelling Avenue at high speeds. <br /> More noise abatement should be considered along Highway 96. <br /> Public Works Director/City Engineer Polka reported MnDOT gathered additional noise <br /> readings along Lakeshore Place and Old Highway 10 in the vicinity of US 10/Highway 96. The <br /> readings did not show significant increases in volumes from the original study. Staff also <br /> submitted a letter to MnDOT with additional concerns regarding the height of the noise wall, <br /> impacts to the Big Ten Tavern, service road entrance design, existing water main and snow <br /> plowing concerns. <br /> Public Works Director/City Engineer Polka stated since the Public Hearing, MnDOT has <br /> received input from affected property owners and completed the voting for the noise wall. A <br /> majority of voting points received were in favor of construction of both of the noise walls (north <br /> of the access to the service road and south of the access onto US 10); therefore, the walls are <br /> proposed with the US 10 project. The layout has also been revised due to input from the Big 10 <br /> Tavern owner. A right turn from the service road to US 10 has been added. The noise wall has <br /> also been modified to provide for the access which then allows a view of the Big 10 Tavern from <br /> US 10. <br /> Public Works Director/City Engineer Polka stated staff had a meeting with MnDOT on January <br /> 18 to discuss the potential noise wall/watermain conflict. She discussed the depth of the <br /> watermain in conjunction with the roadway and stated staff did not recommend the City Council <br /> support the Final Layout of the US 10 Improvements. She explained the watermain would have to <br /> be located at least 10 feet horizontally from the proposed noise wall and be placed at least 7'/2 feet <br /> in depth and should be at MnDOT's cost. <br /> Councilmember Holmes asked when the right-out from the Big 10 Tavern was added by <br /> MnDOT. <br /> Public Works Director/City Engineer Polka stated this was a very recent addition. She noted <br /> she received a revised layout around January 8. She believed these changes were brought about <br /> after a meeting was held between the Big 10 Tavern owner, his attorneys, and MnDOT in <br /> December. She provided further comment on how the service road would be striped for one-way <br /> traffic. <br /> Councilmember Holmes commented the Council has not had an opportunity to discuss the one- <br /> way proposed traffic flow for this roadway. She did not believe this was appropriate and that <br /> traffic should remain two-way. <br /> Public Works Director/City Engineer Polka explained the Council could add a condition, <br /> requiring traffic along this service road to be two-way. She discussed MnDOT's reasoning behind <br /> the one-way proposal, which had to do with snow plowing. <br />