My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-20-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
02-20-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 2:24:49 PM
Creation date
2/15/2018 1:44:37 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1048
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Johanna Marsh Park Concept Plan <br />Estimated Construction Cost <br />By: SF <br />Concept Master Plan: <br />Item Description QTY UNIT ESTIMATED <br />COST <br />1 Mobilization 1 LS $ 5,000 <br />2 Earthwork and Erosion Control 1 LS $ 9,000 <br />3 Tennis Court Removals 1 LS $ 11,760 <br />4 Clearing and Grubbing 1 LS $ 1,500 <br />5 Concrete Sidewalk 2050 SF $ 16,400 <br />6 Concrete Play Area Curbing 450 LF $ 13,500 <br />7 Miscellaneous Site Amenities 1 LS $ 5,500 <br />8 Wood Fiber Mulch 1 LS $ 19,730 <br />9 16' Square Shelter on Concrete Pad 1 LS $ 20,000 <br />10 Viewing Platform 1 LS $ 15,000 <br />11 Native Seed Restoration 0.5 AC $ 3,000 <br />12 Turf Seed Restoration 0.15 AC $ 750 <br />Subtotal $ 121,140 <br />Recommended Contingency (15%) $ 18,171 <br />Estimated Total $ 139,311 <br />Note: <br />WSB Project #011454-000 <br />This estimate is based on concept planning level design work for the purpose of <br />budgeting. It should be anticipated that cost the estimate will need to be refined as the <br />design progresses with greater detail. <br />1/29/2018 K:\011454-000\Quantity\Preliminary\Concept Estimate\2018-01-29 011454-000 Johanna Marsh Park Concept Cost Estimate
The URL can be used to link to this page
Your browser does not support the video tag.