My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-26-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
03-26-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 1:43:54 PM
Creation date
3/23/2018 3:56:43 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />Both bids are higher than the Engineer’s estimate which is $3,019,882.02. In general, all bid <br />items were higher than estimated. The bid tabulation summary is included as Attachment A. <br />The bid was separated into the following schedules: <br /> <br />Schedule* Engineer’s Estimate Bid <br />A – Trail Improvements – South Old Snelling $871,630.81 $915,191.85 <br />B – Trail Improvements – North Old Snelling $971,507.40 $958,090.25 <br />C – Trail Improvements – CR E2 $187,808.81 $198,492.75 <br />D – Storm Improvements – South Trail $89,031.00 $115,653.25 <br />E – Storm Improvements – North Trail $134,004.00 $260,374.75 <br />F – Alternate 1A , Watermain (PVC) Old Snelling $491,470.00 $574,311.00 <br />H – Alternate 2A, Watermain (PVC) CR E2 $274,430.00 $354,156.00 <br />TOTAL $3,019,882.02 $3,376,269.85 <br />*Schedules G and I – HDPE Watermain are not listed. <br /> <br />The Council could choose to eliminate schedules from the bid award. However, Schedules A and <br />D are trail and storm sewer for the same trail segment and must be awarded together as are <br />Schedules B and E. In addition, as discussed at a recent work session, the watermain loop in Old <br />Snelling is needed for future Rice Creek Common development. If the Council chose to <br />eliminate the North Old Snelling Trail and Storm Sewer Improvements (Schedules B and E), the <br />contract amount would be $2,157,804.85. <br /> <br />Sunram has completed similar projects successfully in the metro area. Attached is a letter <br />(Attachment B) from WSB recommending award to Sunram as the lowest responsible/responsive <br />bidder. Attached is Resolution 2018-022 awarding the Old Snelling Trail and Watermain <br />Improvements to Sunram in the amount of $3,376,269.85. Staff recommends adoption of <br />Resolution 2018-022. <br /> <br /> <br /> Attachments <br />Attachment A: Bid Tabulation Summary <br />Attachment B: WSB Letter <br />Attachment C: Resolution 2018-022 Awarding the Contract <br />Attachment D: Detailed Bid Abstract
The URL can be used to link to this page
Your browser does not support the video tag.