My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
04-23-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:20:59 AM
Creation date
4/23/2018 3:02:21 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1048
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rice Creek Watershed District Permit <br />Application Status Update <br />THIS IS NOT A PERMIT <br />Amended CAPROC Notice <br />Permit Application Number: 17-031 <br />Date of Board Action: 05/10/2017 <br />Current Status: Conditionally Approved Pending Receipt Of Changes (CAPROC) <br />Please note the following: <br />You are not authorized to begin site work until all pending items are satisfied as <br />enumerated in the attached Engineer's Report. If project is initiated without <br />obtaining an RCWD Permit, the project will be stopped by the District Inspector <br />until the permit is obtained. <br />You have 12 months from the date of Board action to submit/satisfy all pending <br />items and receive a permit. Otherwise the conditional approval expires and a <br />new application will need to be submitted and considered by the Board. RCWD <br />staff is not authorized to grant extensions. <br />To satisfy pending items, applicants must submit two (2) paper copies of all <br />submittal items to the District with the exception of plan sheets. Plan sheets must <br />include 1 full-sized copies, and 1 reduced size (11 by 17 inches or smaller) or <br />an electronic file. <br />Surety - for surety amounts of$5000 or less, the applicant must submit a check <br />made out to the RCWD. For surety amounts over $5000, the applicant must <br />provide the first $5000 in the form of a check and has the option of providing the <br />remainder of the surety amount in the form of a Letter of Credit (see website for <br />template) or performance bond. An escrow agreement is required with the <br />submittal of surety. (Public entities are not subject to surety obligations.) <br />Easements — if an easement is required per your list of pending items in the <br />attached Engineer's Report, then the legal descriptions of these easements must <br />be prepared by the applicant, reviewed and approved by the District, and then <br />submitted to the County Recorder's Office for recording. An easement template <br />is on the website. <br />Date of Notice: 5/19/2014
The URL can be used to link to this page
Your browser does not support the video tag.