My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-21-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
05-21-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2018 4:23:39 PM
Creation date
5/17/2018 4:22:16 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Projects – Storm Water Fund• Storm Water fund has sufficient cash to pay for projects.27ProjectsProject Number2018 2019 2020 2021 2022EXISTING INFRASTRUCTURE PROJECTSStorm Pond Maintenance 09-Storm-001 50,000Storm Water Inlet/Outlet Repairs 13-Storm-001 25,000Storm Water BMP Study/Construction 17-Storm-001Old Snelling Ave PMP w/ Bridge Reconstruction 17-Str-004 50,000Future PMP 18-Str-005 200,000 200,000Indian Oaks/Floral Dr PMP - 2018 PMP 18-Str-065 555,000Surface Water Project (Undetermined) 18-Storm-001 200,000Actual CIP (2018 Dollars)2018755,000 125,000 200,000 0 200,000Percent Inflation3% 3% 3% 3% 3%Inflated Project Costs 755,000 128,750 212,180 - 225,102 Total Projects to be Bonded for: 5-Year Term 0 0 0 0 010-Year Term0000015-Year Term00000
The URL can be used to link to this page
Your browser does not support the video tag.