My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2018
>
04-23-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 12:27:51 PM
Creation date
6/4/2018 12:27:16 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL — APRIL 23, 2018 <br />R <br />City Planner Bachler stated the Planning Commission recommends approval (5-0) of Planning <br />Case 18-001 for a Preliminary Plat, Final Plat, Comprehensive Plan Amendment, and Variance <br />for the property located at 3246 New Brighton Road, based on the findings of fact and submitted <br />plans in the April 23, 2018 Report to the City Council, as amended by the following nineteen (19) <br />conditions: <br />1. The project shall be completed in accordance with the submitted plans as amended by the <br />conditions of approval. Any significant changes to these plans, as determined by the City <br />Planner, shall require review and approval by the Planning Commission and City Council. <br />2. The execution of the Final Plat shall be contingent upon the Metropolitan Council's <br />approval of the Comprehensive Plan Amendment. <br />3. A Development Agreement shall be prepared by the City Attorney and subject to City <br />Council approval. The Development Agreement shall be executed prior to the execution of <br />the Final Plat. <br />4. The applicant shall submit a park dedication fee in the amount of $26,000, subject to the <br />approval of the City Council. The park dedication fee shall be submitted prior to the <br />execution of the Final Plat. <br />5. The applicant shall file the Final Plat with the Ramsey County Recorder and provide the <br />City with a recorded copy within sixty (60) days of approval. <br />6. The applicant shall address all comments included in the memo provided by the Public <br />Works Director/City Engineer dated March 7, 2018 prior to the issuance of any <br />development permits. <br />7. The applicant shall provide the City with a copy of the approved Rice Creek Watershed <br />District Permit prior to the issuance of any development permits. <br />8. Copies of the cross access easements for the driveways shall be provided to the City prior <br />to the issuance of any building permits. <br />9. Final grading and drainage plans shall be subject to approval by the City Engineer prior to <br />the commencement of any construction on the site. <br />10. Before construction, grading, or land clearing begins, trees or tree areas that are to be <br />preserved shall be visibly marked and city -approved tree protection fencing or other <br />method shall be installed and maintained at the critical root zones of the trees to be <br />protected. The location of the fencing sh.,i I l be in conformance with the approved tree <br />preservation plan. <br />11. A Letter of Credit in the amount of 125 percent of the cost of materials and installation for <br />the required replacement tree plantings shall be provided prior to the issuance of any <br />development permits. The Letter of Cred shall be valid for two full years from the date of <br />installation of the replacements trees. <br />12. The applicant shall work with the City to locate the additional 52 caliper inches of <br />replacement trees on site. If the City determines that there is not sufficient space on site for <br />the replacement tree plantings, the applicant shall work with the City to find an alternative <br />off-site location or a fee in lieu of the replacement tress will be required equaling the cost <br />of materials and installation plus ten percent, as determined by the City Council. <br />13. Survey monuments shall be placed and installed at all block corners, angle points, points <br />of curves in streets, and at intermediate points as shown on the Final Plat. Pipes or streel <br />rods shall be placed at the corners of each lot. <br />14. Wetland monument signs will be required to adequately define the wetland buffer area, <br />subject to the approval of the Public Works Director. <br />
The URL can be used to link to this page
Your browser does not support the video tag.