Laserfiche WebLink
ARDEN HILLS CITY COUNCIL – MAY 29, 2018 8 <br /> <br />6. The applicant shall address all comments included in the memo provided by the Public <br />Works Director/City Engineer dated May 22, 2018 prior to the issuance of any <br />development permits. <br />7. The applicant shall provide the City with a copy of the approved Rice Creek Watershed <br />District Permit prior to the issuance of any development permits. <br />8. Final grading and drainage plans shall be subject to approval by the City Engineer prior to <br />the commencement of any construction on the site. <br />9. The applicant shall provide a minimum of three (3) trees in the front yard of each lot. <br />Coniferous trees must be at least six (6) feet in height and deciduous trees a diameter of <br />two and one-half (2.5) inches. <br />10. The applicant shall provide a Tree Preservation Plan that provides for the required 82 <br />caliper inches of replacement trees on site. If the City determines that there is not <br />sufficient space on site for the replacement tree plantings, the applicant shall work with <br />the City to find an alternative off-site location or a fee in lieu of the replacement tress will <br />be required equaling the cost of materials and installation plus ten percent, as determined <br />by the City Council. <br />11. Before construction, grading, or land clearing begins, trees or tree areas that are to be <br />preserved shall be visibly marked and city-approved tree protection fencing or other <br />method shall be installed and maintained at the critical root zones of the trees to be <br />protected. <br />12. A Letter of Credit in the amount of 125 percent of the cost of materials and installation <br />for the required replacement tree plantings shall be provided prior to the issuance of any <br />development permits. The Letter of Credit shall be valid for two full years from the date <br />of installation of the replacements trees. <br />13. Survey monuments shall be placed and installed at all block corners, angle points, points <br />of curves in streets, and at intermediate points as shown on the Final Plat. Pipes or streel <br />rods shall be placed at the corners of each lot. <br />14. Wetland monument signs will be required to adequately define the wetland buffer area, <br />subject to the approval of the Public Works Director. <br />15. Sewer and water for the subdivision shall be obtained by connections to the City water <br />and sewer systems. Extension of City services shall be subject to review and approval by <br />the City Engineer and all associated costs shall be the responsibility of the developer. <br />16. A grading as-built and utility as-built plan shall be provided to the City upon completion <br />of grading and utility work. <br />17. The project may require permits, including, but not limited to, MPCA-NPDES, Rice <br />Creek Watershed District, Minnesota Department of Health, MPCA- Sanitary Sewer <br />Extension, Ramsey County and City Right of Way, and City Grading and Erosion Control <br />permits. Copies of al issued permits shall be provided to the City prior to the issuance of <br />any development permits. <br />18. The developer shall comply with all other applicable provisions of the City Code and its <br />related Ordinances. <br /> <br />MOTION: Councilmember Holden moved and Councilmember McClung seconded a <br />motion to approve Planning Case 18-013 for a Preliminary Plat, Final Plat, <br />and Comprehensive Plan Amendment at 3246 New Brighton Road, based on