Laserfiche WebLink
Page 2 of 2 <br /> <br />Staff requested proposals for design from two firms. Staff has reviewed the proposals and is <br />recommending that the City Council accept the proposal as presented by Bolton & Menk. A <br />summary of the proposals is shown in the following table: <br /> <br />FIRM Design Services <br />Bolton & Menk $42,142.00 <br />WSB $44,350.00 <br /> <br />Funding for this project is proposed to be paid for from the Surface Water Fund. <br /> <br />Attachments <br />Attachment A: WSB Drainage Report <br />Attachment B: Bolton & Menk Proposal – Colleen Avenue Drainage Improvements <br /> <br />