My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-25-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
06-25-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:58:58 AM
Creation date
6/21/2018 3:49:20 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submitted by Bolton & Menk, Inc.Colleen Avenue Drainage Improvements | City of Arden Hills, Minnesota 5 <br />Proposal for <br />Colleen Avenue Drainage Improvements <br />City of Arden Hills, Minnesota <br />Task 3: Project Design, Plans, & Specifications <br />From the storm water model prepared by others and determination of HWL and EOF elevations, Bolton & Menk will <br />develop final plans and specifications for the storm sewer, raising the bituminous trail prescribed 932.80 elevation, and <br />associated restoration efforts. <br />Up to three alternatives will be considered and reviewed with the City for installation of storm sewer between Colleen <br />Avenue and the wetland. Should a trenchless method be preferred consistent with the preliminary design <br />recommendation, we would recommend geotechnical work be completed to identify potential risks during construction <br />and enable proper bidding of trenchless work by contractors. Recommendations regarding the necessity of geotechnical <br />work, or lack thereof depending on review of installation alternatives, will be made as part of our final design efforts. <br />Geotechnical efforts are not included in this proposed scope. <br />Final plans for the project will be completed to meet City Standards. The plans will be developed in Civil 3D software and <br />are anticipated to include the following sections: <br />Plan and profiles sheets of the storm drainage system including drainage structures and pipe discharge <br />Plan and profiles, as well as cross sections at 25’ intervals, for the bituminous path <br />Roadway patching/partial reconstruction for storm sewer installation. <br />Title sheet, legend, removals/existing conditions, construction details, and SWPPP sheets <br />60% and 90% plan sets will be developed for City review and comment. Project specifications and construction estimates <br />will also be developed utilizing Bolton & Menk’s standard format for the final bid package. <br />Bolton and Menk will assist the City in advertising the project for competitive bidding, reviewing and responding to any <br />bidder questions, developing and issuing any addenda necessary, reviewing the bids, and making a recommendation for <br />award. If the City desires construction phase services, Bolton & Menk can provide such efforts under a separate <br />proposal. <br />Task 4: Project Management and Meetings <br />Bolton & Menk’s project manager will manage and coordinate the project progress, milestones, and schedule. <br />Anticipated project meetings include two neighborhood and stakeholder meetings; three wetland coordination and <br />review meetings; three City staff project update/review meetings, and one City Council or Advisory Commission <br />meeting.
The URL can be used to link to this page
Your browser does not support the video tag.