Laserfiche WebLink
Page 1 of 1 <br /> <br />CONSENT ITEM – 7G <br /> <br />MEMORANDUM <br /> <br />DATE: July 23, 2018 <br /> <br />TO: Honorable Mayor and City Councilmembers <br /> Dave Perrault, City Administrator <br /> <br />FROM: Sue Polka, Public Works Director/City Engineer <br /> <br />SUBJECT: Catch Basin Repairs – Lametti Lane <br /> <br /> Budgeted Amount: Actual Amount: Funding Source: <br /> N/A $16,750.00 Surface Water Utility <br /> <br />Council Should Consider <br />Approving catch basin repairs in the amount of $16,750.00. <br /> <br />Background/Discussion <br />The catch basins on Lametti Lane (Attachment A) have deteriorated to the point that repairs to <br />the existing structures are not feasible. Due to the structure size and depth, staff obtained a quote <br />from Valley Rich for the catch basin replacement as the City does not have the necessary <br />equipment to replace the structures. Valley Rich provided a quote in the amount of $16,750 to <br />replace the catch basins and complete associated curb repairs (Attachment B). <br /> <br />Staff recommends that the Council authorize Valley Rich to complete the catch basin <br />replacement in the amount of $16,750.00. <br /> <br />Attachments <br />Attachment A – Location – Lametti Lane <br />Attachment B – Valley Rich proposal <br />