My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-13-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
08-13-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2018 4:19:31 PM
Creation date
8/9/2018 4:17:58 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2018 STREET AND UTILITY IMPROVEMENT PROJECT <br />CITY PROJECT NO. PW-17-0102 <br />CITY OF ARDEN HILLS, MN <br />WSB PROJECT NO. R-010111-000 <br />OWNER: <br />CITY OF ARDEN HILLS <br />1245 WEST HIGHWAY 96 <br />ARDEN HILLS, MN 55112 <br />YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: <br />CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: <br />ORIGINAL CONTRACT PRICE: $2,491,595.86 ORIGINAL CONTRACT TIME: 5/14/2018 <br />PREVIOUS CHANGE ORDERS: N/A $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE <br />CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $2,491,595.86 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 5/14/2018 <br />NET INCREASE OF THIS CHANGE ORDER:$40,408.53 NET INCREASE WITH CHANGE ORDER: NONE <br />CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $2,532,004.39 CONTRACT TIME WITH APPROVED CHANGE ORDERS: 5/14/2018 <br />RECOMMENDED BY: APPROVED BY: <br />ANDREW J. BROTZLER, PE, PROJECT MANAGER <br />WSB & ASSOCIATES, INC. <br />ENGINEER <br />APPROVED BY: <br /> CITY ENGINEER <br />DATE <br />CHANGE ORDER NO. 1 <br />7/18/2018 <br />DATE <br />CONTRACTOR SIGNATURE <br />CITY ADMINISTRATOR <br />CONTRACTOR <br />CONTRACTOR: <br />NORTHWEST ASPHALT, INC. <br />1451 STAGECOACH ROAD <br />SHAKOPEE, MN 55379 <br />NORTHWEST ASPHALT, INC. <br />1. TIME AND MATERIALS FOR EXCAVATING DOWN TO REMOVE AND REPLACE A 6" GATE VALVE AT WEDGEWOOD CIRCLE THAT WAS A GREATER DEPTH (13-FT) <br />THAN SHOWN ON THE PLANS AND SURROUNDED BY SATURATED SOILS DUE TO THE LEAKING GATE VALVE. <br />2. TIME AND MATERIALS FOR EXCAVATING DOWN TO REMOVE AND REPLACE A 6" GATE VALVE AT PARKSHORE DRIVE AND OLD HWY 10 THAT HAD ALREADY <br />BEEN REPLACED BY OTHERS. <br />3. TIME AND MATERIALS FOR FIXING A 6" WATERMAIN BREAK ON BRUEBERRY LANE THAT OCCURRED WHEN REPLACING AN 8" GATE VALVE AT THE <br />INTERSECTION OF BRUEBERRY LANE AND OLD HWY 10. <br />4. TIME AND MATERIALS FOR REMOVING A GATE VALVE AND INSTALLING AN 8" GATE VALVE AT INTERSECTION OF BRUEBERRY LANE AND OLD HWY 10. DRAIN <br />TILE PIPE IS INCLUDED IN THIS CHANGE ORDER FOR THE STORM ON GALE CIRCLE. <br />5. SOIL CORRECTION ITEMS FOR THE WATERMAIN BEDDING, SUCH AS 1 1/2" CLEAR ROCK AND PEAT REMOVAL & DISPOSAL ARE ALSO INCLUDED. <br />K:\010111-000\Admin\Construction Admin\Change Orders\ <br />010111-000 Change Order 1 (Requests 1-4 Combined)CO-1
The URL can be used to link to this page
Your browser does not support the video tag.