Laserfiche WebLink
701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800 <br /> <br />Building a legacy – your legacy. <br />Equal Opportunity Employer | wsbeng.com <br />K:\010111-000\Admin\Construction Admin\Change Orders\R-010111-000 CST LTR CO 1 CTY-s polka-080618.docx <br /> <br /> <br /> <br />August 6, 2018 <br /> <br /> <br /> <br />Ms. Sue Polka, PE <br />Public Works Director/City Engineer <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />Re: Change Order No. 1 <br />2018 Street and Utility Improvement Project <br /> City Project No. PW -17-0102 <br /> City of Arden Hills, MN <br />WSB Project No. R-010111-000 <br /> <br /> <br />Dear Ms. Polka: <br /> <br />Please find enclosed for your review and approval Change Order No. 1 for the 2018 Street and Utility <br />Improvement Project. Following is a summary of the items included as part of Change Order No. 1: <br /> <br />1. Time and materials for excavation of extra-depth 6-inch gate valve on Wedgewood Circle, <br />including granular backfill to replace existing saturated soils due to leaking valve. <br /> <br />2. Time and materials for excavation to replace 6-inch gate valve at Parkshore Drive and Old Hwy <br />10 – determined that valve had previously been replaced by others. <br /> <br />3. Time and materials for repair of 6-inch watermain break on Brueberry Lane that occurred during <br />replacement of 8-inch gate valve at the intersection of Brueberry Lane and Old Hwy 10. <br /> <br />4. Time and materials for removal of gate valve and installation of 8-inch gate valve at intersection <br />of Brueberry Lane and Old Hwy 10. <br /> <br />The total amount of Change Order No. 1 is $40,408.53, resulting in a revised contract amount of <br />$2,532,004.39. No change in contract time is proposed with this change order. <br /> <br />Please do not hesitate to contact me with questions. Thank you. <br /> <br />Sincerely, <br /> <br />WSB & Associates, Inc. <br /> <br /> <br /> <br /> <br />Andrew J. Brotzler, PE <br />Principal/Sr. Project Manager <br /> <br />Attachments <br /> <br />srb