Laserfiche WebLink
<br />City of Arden Hills <br />Planning Commission Meeting for February 7, 2018 <br />P:\Planning\Planning Cases\2017\PC 17-029 - 3685 New Brighton Road Preliminary and Final Plat and Easement <br />Vacation\Memos_Reports_17-029 <br />Page 4 of 15 <br />The property is traversed by a wetland area along the western boundary of the lot that extends off <br />site to the north and south. In order to satisfy Rice Creek Watershed District requirements, the <br />development will be required to construct two basins on Lot 1 that will capture stormwater <br />runoff from the entire site and allow water to discharge into the adjacent wetland area. The <br />Subdivision Code requires that a drainage easement be provided for wetland areas and <br />stormwater management facilities. The plat provides adequate easements for the wetland, the <br />basins, and the other drainage facilities on the site. <br /> <br />The City has an existing lift station located along the southern property line of the lot along <br />Thom Drive. This lift station is located on private property and the City has an easement that <br />permits the City to operate and maintain the lift station. The existing easement for the lift station <br />is larger in area than the footprint of the facility. The proposal includes a partial vacation of this <br />easement to accommodate the access driveway for Lot 2. The Public Works Director/City <br />Engineer has reviewed the new easement area and determined that it provides adequate area for <br />the City to continue to operate and maintain the lift station. The easement area would also be <br />sufficient if the City need to reconstruct the lift station in the future. <br /> <br />The vacation of a public easement requires a public hearing before the City Council. At the time <br />Planning Case 17-029 is reviewed by the City Council, a public hearing will also be held for the <br />proposed vacation. <br /> <br />C. Lots <br /> <br />Location and Size <br />All lots are required to abut by their full frontage on a public street and meet the minimum lot <br />dimensions required by the Zoning Code. All three lots have full frontage on a public street and <br />meet the minimum standards for the R-2 District. <br /> <br />Watercourse <br />Lots abutting upon a wetland are required to have additional width or depth to assure building <br />sites are not subject to flooding. All building areas should be located outside the natural feature <br />and a minimum of two feet above the 100-year flood elevation. Lot 1 abuts a wetland area on the <br />west side of the property. The building pad site is located outside of the delineated wetland area. <br />The lowest level of the proposed dwelling on Lot 1 is 893 feet, and the 100-year high water level <br />for Basin 1 is 888.9 feet and for Basin 2 886.1 feet. <br /> <br />Corner Lots <br />Corner lots shall be platted at least 10 feet wider than the minimum requirement for interior lots. <br />The minimum lot width for the R-2 District is 85 feet. Lot 3 is a corner lot and would have a <br />width of 120 feet. <br /> <br /> <br /> <br />