Laserfiche WebLink
Minnesota Public Facilities Authority <br />2018 Special Appropriation <br />APPENDIX B <br />Real Property Declaration and Waiver Requirements <br />A recipient receiving an appropriation of state general obligation bond proceeds is required to: <br />-Record a Real Property Declaration that identifies the properties on which the recipient uses <br />PFA funds as “state bond financed property <br />or <br />-Request a waiver from Minnesota Management and Budget (MMB) from the recording <br />requirement, and sign a Waiver Certification <br />and/or <br />-Both record a Real Property Declaration and request a waiver/sign a Waiver Certification <br />Recipients must provide a copy of the recorded Declaration and/or signed Waiver Certification and/or a <br />copy of the recorded Declaration to PFA and MMB prior to disbursement of money for construction <br />activities or as soon thereafter as possible. <br />Real Property Declaration - The recorded Real Property Declaration places limitations on the use and sale <br />of real property improved with state bond proceeds under Minn. Stat. Sec. 16A.695 and the Fourth Order <br />Amending Order of the Commissioner of Finance dated July 30, 2012 (the “Commissioner’s Order”). Some <br />activities needing this: treatment plants, ponds, lift stations, water towers, demolition sites. Recipients <br />should have an attorney draft the Declaration and confirm the accuracy of the recordable parcel(s). <br />Real Property Declaration Recording Waiver - Section 7.02 of the Commissioner’s Order allows the <br />Commissioner of Minnesota Management and Budget (MMB) to waive the declaration recording <br />requirement for projects or portions of projects located within roads, highways or utility or transit <br />corridors, easements or rights or way where recording would be problematic. If your project, or a portion <br />of it fits this description, the recipient should request a waiver from the recording requirement from <br />MMB. <br />If MMB grants the waiver from the recording requirement, the recipient will need to sign a Waiver <br />Certification for those parts of the project, in which the recipient acknowledges that those project areas <br />are “state bond financed property”. A description (legal description not needed) and/or map of the <br />project areas should be attached to the Waiver Certification. <br />The following documents are attached: <br />•Example Real Property Declaration <br />•Information for Requesting a Waiver from Real Property Filing <br />•Example Letter to MMB Requesting Approval of a Waiver <br />•Example MMB Waiver Certification