PRELIMINARY OPINION OF PROBABLE PROJECT COSTHamline Avenue CrosswalksNovember 8, 2018Prepared by HR Green2021.501 MOBILIZATIONLUMP SUM 9,681.00$ 0.50 0.50 4,840.50$ 4,840.50$ 2104.502 SALVAGE SIGN TYPE CEACH 48.00$ 1 1 48.00$ 48.00$ 2104.503 REMOVE CURB AND GUTTERLIN FT 4.15$ 48199.20$ -$ 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 2.00$ 80 80 160.00$ 160.00$ 2104.504 REMOVE SIDEWALKSQ YD -$ 9-$ -$ 2104.603 REMOVE AND REPLACE BITUMINOUS PAVEMENT LIN FT 45.00$ 482,160.00$ -$ 2211.507 AGGREGATE BASE (CV) CLASS 5CU YD 25.00$ 9 7 225.00$ 175.00$ 2301.602 DRILL AND GROUT REINFORCEMENT BAR (EPOXY COATED) EACH 20.00$ 12 8 240.00$ 160.00$ 2521.618 CONCRETE WALKSQ FT 9.50$ 484 336 4,598.00$ 3,192.00$ 2531.603 CONCRETE CURB AND GUTTERLIN FT 31.00$ 104 56 3,224.00$ 1,736.00$ 2531.618 TRUNCATED DOMESSQ FT 45.00$ 42 32 1,890.00$ 1,440.00$ 2563.601 TRAFFIC CONTROLLUMP SUM 5,000.00$ 0.50 0.50 2,500.00$ 2,500.00$ 2563.601 ALTERNATE PEDESTRIAN ROUTE LUMP SUM 1,500.00$ 0.50 0.50 750.00$ 750.00$ 2564.502 INSTALL SIGN TYPE CEACH 150.00$ 1 1 150.00$ 150.00$ 2573.502 STORM DRAIN INLET PROTECTIONEACH 165.00$ 2 2 330.00$ 330.00$ 2575.604 SITE RESTORATIONSQ YD 10.00$ 440.00$ -$ 2582.518 CROSSWALK PAINTSQ FT 3.50$ 144 -$ 504.00$ SUBTOTAL CONSTRUCTION COST $21,354.70 $15,985.50CONTINGENCY 20% $4,270.94 $3,197.10ENGINEERING COSTTOTAL CONSTRUCTION COSTTOTAL ESTIMATED COSTMID-BLOCK CROSSING$7,500.00$52,308.24ITEM NUMBERITEM DESCRIPTION UNITS UNIT COSTTOTAL ESTIMATED QUANTITY WYNCREST COURT TOTAL ESTIMATED COSTWYNCREST COURTTOTAL ESTIMATED QUANTITY MID-BLOCK CROSSING Page 8 of 9