My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-19-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
01-22-19-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2019 3:37:18 PM
Creation date
1/24/2019 3:36:53 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />Page 7 <br />PRELIMINARY OPINION OF PROBABLE CONSTRUCTION COST (On Next Page) <br />The following cost estimate is a preliminary assessment of the work that is recommended above for <br />each location. This estimate does not account for survey or field data collection that will be required to <br />determine the existing slopes at the south leg of Wyncrest and the mid-block crosswalk. A contingency <br />of 20% was used based on the preliminary nature of the estimate and uncertainty regarding the <br />construction bidding environment. <br />If the County or City has an on-call concrete contractor that does flatwork from year-to-year, the amount <br />of work required for both crossings could be included in that contract. This would likely reduce the <br />overall cost because it would reduce the mobilization cost. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.