Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />Page 7 <br />PRELIMINARY OPINION OF PROBABLE CONSTRUCTION COST (On Next Page) <br />The following cost estimate is a preliminary assessment of the work that is recommended above for <br />each location. This estimate does not account for survey or field data collection that will be required to <br />determine the existing slopes at the south leg of Wyncrest and the mid-block crosswalk. A contingency <br />of 20% was used based on the preliminary nature of the estimate and uncertainty regarding the <br />construction bidding environment. <br />If the County or City has an on-call concrete contractor that does flatwork from year-to-year, the amount <br />of work required for both crossings could be included in that contract. This would likely reduce the <br />overall cost because it would reduce the mobilization cost. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />