Laserfiche WebLink
Page 2 of 2 <br /> <br />The total estimated cost for the pedestrian improvements is $52,308.24, which includes an <br />engineering cost of $7,500 for design and plan preparation. An overview of the improvements is <br />shown on Attachment B. <br /> <br />Attachment A: HR Green Memo – Hamline Avenue Crosswalks <br />Attachment B: Proposed Improvements at Wyncrest Court <br />Attachment C: Proposed Mid-block Improvements between Indian Oaks Circle and Eide Circle