My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-19-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2019
>
04-22-19-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2019 4:14:40 PM
Creation date
4/18/2019 4:08:19 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Install new 4G modems for the existing OmniSite system <br />• Install new equipment at the booster station (existing system is no longer <br />supported) <br />• Install private radio telemetry for communication between the North Tower and <br />the booster station <br /> <br />The draft 2019/2020 Capital Improvement Program identifies $125,000 for the design <br />and implementation of the utility monitoring upgrades (Attachment C). HR Green <br />estimates the remaining cost for design, equipment and implementation to be $74,800. <br />The total project cost is currently estimated at $90,200 which is less than the amount <br />identified in the CIP. Staff recommends the Council approve the professional services <br />agreement for the design of the utility monitoring system and move forward with the <br />system upgrades in 2019. <br /> <br />Attachments <br />Attachment A: Professional Services Agreement <br />Attachment B: Technical Memorandum – Existing SCADA System Analysis <br />Attachment C: Capital Improvement Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.