Laserfiche WebLink
Date: <br />To:Jeff Frid <br />City of Arden Hills <br />Public Works <br />1425 Paul Kirkwold Drive <br />Arden Hills, MN <br />From:Mark Brinker <br />One (1) 2019 Aries Pathfinder system mounted in 7' x 14' Command Center per <br />Minnesota State Contract #105679 and including the following features/options: <br />1.0 Pathfinder system base price 67,029.00$ <br />1.2.6 Large line kit w/ 8" phenmatic wheels 5,974.00$ <br />1.2.13 High traction carbide tires ( 4 )804.00$ <br />1.2.25 Dually 5" wheel assembly ( 4 )1,304.00$ <br />1.5.3 Rack mounted desktop computer, UPS, and 19" Monitor 5,747.00$ <br />1.5.35 19" LCD desktop monitor 1,036.00$ <br />1.5.36 19" Rear viewing monitor 982.00$ <br />1.6.3 Add Pathfinder reel mounting kit with stand 617.00$ <br />5.0 Base Unit Price Command Center 63,693.00$ <br />5.1.1 Roof mounted A/C unit 1,848.00$ <br />5.1.2 Add 1500 watt wall mounted heater (2)832.00$ <br />5.1.3 Add padded bench seat 255.00$ <br />5.1.6 Vise to workbench 95.00$ <br />5.1.5 Substitute Lonplate flooring (per room) (2)Included <br />5.2.1 Tall closet in control room, with shelves 1,185.00$ <br />5.2.5 Cabinet over workbench with work light 638.00$ <br />5.2.6 Stacked aluminum shelving, equipment room 445.00$ <br />5.2.8 9 drawer tool box with tools 899.00$ <br />5.4.4.Add 19-gallon washdown system w/ 25' retractable reel assy.1,206.00$ <br />5.5.2 Rear arrow stick w/ controller, ( traffic control )884.00$ <br />5.5.6 Cold-weather door kit installed 2,025.00$ <br />5.5.14 Substitute 7' x 14' enclosed trailer outfitting package ( deduct )(20,722.00)$ <br />5.5.15 Add 7' x 14' 7000lbs extended tongue trailer 8,561.00$ <br />145,337.00$ <br />FLEXIBLE PIPE TOOL COMPANY <br />Sewer Cleaning and Inspection Equipment - Sales and Service <br />22606 186th Avenue, Cold Spring, MN 56320 <br />Phone: 320-597-7552 Fax: 320-597-7882 Toll Free: 800-450-6969 <br />March 20, 2019 <br />We are pleased to submit the following quotation. All prices are subject to immediate acceptance. <br />Clerical errors are subject to correction. All agreements are contingent upon fires, accidents, labor <br />difficulties and causes beyond our reasonable control. No statement, contract or order will be binding <br />on the Company unless made or approved on behalf of the Company by one of its officers. <br /> Equipment Subtotal